A Billboard Lease Can Put a Sign Company's Truck in Your Chesterfield Yard

A billboard beside your Chesterfield lot brings a sign company's truck and lease into the roof plan. Settle these points before Roof Day.

Sheet
A11
Subject
Storm record and statute
For
A homeowner after a storm
Trade
Roof repair, roof replacement

A billboard does not need to stand on your lot to change your roof plan. A sign on the neighboring parcel, on a strip of road frontage, or at a corner you share with a commercial lot can still send a sign company's truck through the same drive you planned for shingle bundles and a roof trailer. In Chesterfield, where highway frontage and commercial lots sit close to homes, this is a real question for some owners. This page covers what to settle before the crew arrives and what to ask each roofer to put in writing.

Who controls the sign ground

Many outdoor advertising structures stand on land the sign owner leases rather than owns. The lease sets where the footing sits, what access the sign company has, and when its crews may come in. Your roof crew has no right to the sign company's gravel, its gate code, or the strip of ground around the pole. Before you plan staging, find out whose name is on the lease. A recorded lease or easement may sit with the county recorder, and the city's zoning or sign permit desk will show the sign permit, which usually names the owner and a contact. Ask the owner, not only the sign crew, whether a roofing truck may use the access drive on roof day.

The access drive and the truck line

Many sign structures are reached by a gravel or paved drive that cuts across a lot line or runs along a shared curb. If that drive is the only firm ground a roof trailer can reach without crossing a lawn, it becomes the trailer's route. A sign crew's service call can block it for an afternoon. A face replacement, where a lift truck comes in and sets up for hours, can block it for a full day or more. Ask the sign company for its service calendar for the months you are considering, and ask whether it runs regular checks under a standing contract. Write both sets of dates on the same sheet as your roof date.

The shingle truck itself matters. A delivery truck is long and heavy, and it needs room to turn and a firm surface to park on. If the drive is narrow, has a soft shoulder, or has a turn the lift truck already uses, the roofing truck may have to stop at the street and carry bundles in by hand, or wait while the sign crew finishes. Each roofer should say how the bundles get from the truck to the eave, and whether that route crosses the sign drive. The answer belongs in the written scope, because it sets the delivery window and the number of carry trips, and carry trips show up in the price.

Footing, guard posts and the staging line

A sign pole or monopole stands on a concrete footing that is often larger than it looks above grade. Many structures have guard posts, bollards, or a short fence around the base. Your roof crew should not stage materials against any of these, and should not set a ladder against a structure that was never built to take one. Keep the staging pile well clear of the footing and any guy wires. A bundle stack that shifts under a load, or a ladder that slips against a steel base, can damage the sign and injure a crew member in the same moment.

Freeze and thaw matter here too. In St. Louis winters the ground around a footing heaves and settles, and a staging area that was firm in October can soften in March. If the roof date falls near a thaw, ask each roofer how the staging line is checked before the first load comes off the truck.

Ask for the staging line in writing. A sketch with the sign footing, the drive, and the lot line marked is more useful than a verbal description. Each roofer should mark the same three things on the same sketch. If one roofer marks the footing and another does not, that gap is itself a comparison point, and you can ask the second roofer to add it before you sign.

Lease terms that reach your roof date

Sign leases often include clauses that sit outside anything the homeowner signed. A lease may give the sign company the right to enter the property at any hour, or require a notice period before a crew comes in. If your lot is the one the sign company uses, your roof date may fall inside a notice gap. You do not need to read the whole lease. Ask for the access clause and the notice clause, and ask whether the sign company will confirm roof day in writing. A text from a dispatcher is less useful than an email that names the date, the crew, and the time window.

Damage can also come up. If a roof trailer knocks a sign's cable, bends a lighting fixture, or dents a pole cover, the owner may want a record of the event. Ask each roofer how the crew logs contact with neighboring structures, and whether the homeowner gets a copy of that log. A short dated log costs little, and it settles a dispute faster than memory does.

Questions to put to each roofer

  • Which drive does the crew plan to use, and is it the sign company's drive or yours?
  • Where does the staging line sit relative to the sign footing and any guy wires?
  • How many bundle carry trips does the bid assume if the truck cannot reach the eave?
  • Who calls a stop if a sign crew arrives during the day, and what does the crew do when that call comes?
  • Who on the crew checks the staging line each morning before the first load comes off the truck?

What to ask the sign company and the city

Call the sign owner's office, not the field crew. Ask for the name of the lease holder, the service calendar, and the access clause. Then ask the city's zoning desk for the sign permit on file for the structure. The permit shows the owner and a contact number, and the owner's office can confirm whether the drive is open on a given day. A sign permit and a roofing permit are separate records, and neither one gives the roof crew access to a neighbor's drive. Keep both in your file, labeled apart.

Put it on one sheet

Write the sign company's dates, the staging line, the truck route, and the carry count on a single page. Give a copy to each roofer and keep one for yourself. When a roofer's answer changes, the page shows the change, and you can ask for the reason in writing. Your roof date should move only after the sign owner has confirmed in writing that the drive is open that day.

If you want to check the access before you book, call Keys at (314) 220-2333 and ask the office to walk the drive and the staging line with you. The office can tell you what the crew needs to see on paper, and what a written scope with photos and measurements of the site will include. You can also ask for the same walk from every roofer you are comparing, so that each one plans from the same ground.

Chesterfield, Missouri

Have the roof documented properly

Photographs, measurements and a written scope, produced by somebody who has been on the roof. What you do with the document is entirely your business.