A Bowling Alley or Multiplex Can Fill the Lot Your Chesterfield Roof Crew Needs
A busy evening lot next door can take the space your roof crew planned for, so get the staging spot in writing before the shingles are ordered.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
A bowling alley or a movie multiplex makes a fine neighbor on an ordinary Tuesday. On a roof day it can be a problem, because its parking lot is often the only flat, paved space within reach of your house, and the crew may plan to use it for pallets, a trailer, or a dumpster swap. A lot that is empty at seven in the morning can be full by five in the evening, and a Saturday matinee line can fill it before the crew has finished unloading. This page is for a Chesterfield homeowner who is comparing roofers and wants to know what a busy lot next door means for the schedule, and what to ask each roofer before the order is placed.
Town roofing
A roof crew on a single-family lot needs three things from the street: a place for the delivery truck to stop, a spot for a trailer or a dumpster, and a clear path from the curb to the house. The curb in front of your home is the usual first choice, but curbs in Chesterfield are often shared with mailboxes, hydrants, school drop-offs, and driveway aprons that the city may not want blocked. When the front is not enough, the crew looks at the nearest open lot, and that is where a bowling alley or a movie theater comes in.
Commercial lots have their own rhythms. An evening lot fills with arriving guests at the same hour the crew is packing up, and the staff may tow or ticket vehicles in a lot that is posted for customers only. A lot that empties at nine at night can still hold a row of cars for an early league or a Sunday matinee cleanup. The crew cannot assume a lot is free because the store's hours look quiet on paper. The owner or the property manager has to say yes in writing, and that yes has to name the days and the hours.
Winter adds a second problem. When a parking lot is plowed, the snow goes to the edges, often into the very corner where a crew would stack bundles. A plow pile can narrow a turn, hide a curb cut, or leave a slushy lane that a loaded pallet jack sinks into. Freeze and thaw cycles soften asphalt at the edges in late winter, so a spot that held a trailer in January may not hold it in March. The crew should walk the lot on the day of the drop, not only on the day of the bid.
Spring brings the opposite problem. Hail season and the first warm weekends bring more customers, more events, and more cars into lots that were quiet in February. If your roof date sits in the middle of a busy month, ask the roofer how the crew will handle a lot that is full on arrival. Some crews stage at the curb and carry bundles up the walk, which costs time but keeps the lot clear. Others ask for a second drop after the lot empties. Both answers can work. What matters is that the roofer names one of them before the day.
Permits sit beside the lot question. A roof permit in the City of Chesterfield may require an inspector to reach the house and the work area, and a blocked driveway or a crew truck parked across the walk can complicate that visit. Ask where the permit card will hang while the crew works, and ask whether the crew will keep the front walk open for an inspector. Keep the lot question and the permit question on the same written page, because they often collide on the same morning.
Before you sign, walk the lot with the roofer on a day that matches the roof day as closely as you can. A Friday evening and a Saturday morning will show a different lot than a weekday at noon. Ask the roofer to mark the staging spot on a sketch with dimensions, and ask the lot owner to confirm that spot in a dated note. A sketch with measurements is more useful than a phrase like the lot next door, because a crew working from memory will not know which row is theirs.
What it costs
A lot that is not available on the day of the drop does not stop the roof, but it moves money around. If a shingle delivery arrives at a full lot and the driver cannot unload, the load may wait on the truck, return to the yard, or be set down somewhere the crew did not plan. Each of those choices can add a second delivery charge, a crew standby day, or a fuel and trip line. None of these is a mystery. They are lines a roofer either names in the bid or leaves for later, and the difference between the two is what you are comparing.
A roof bid that assumes a free curb and a quiet lot has a hidden condition built into it. Ask the roofer which lot the crew expects to use, and whether the bid includes a standby day if that lot is not available. A roofer who plans the drop for the street and the lot together will usually price a second truck stop or a hand-carry from the curb. A roofer who says nothing about the lot has not decided yet, and the cost of that decision will fall on whichever party the contract did not name.
A standby day is worth asking about by name. Some roofers bill it, some absorb it, and some fold it into a labor rate. Whichever way the bid is built, a standby day caused by a lot that was not available should appear in the contract with a rule for who pays. Do not sign a bid that leaves that sentence out, and do not rely on a verbal promise that the problem will not come up.
Keys Roofing is the contractor behind this site. Whichever roofer you are comparing, ask for the staging plan in the written scope, along with the photographs and measurements that show the site. If you want to talk through the lot question before you sign, call the Keys Roofing office at (314) 220-2333 and ask for the staging answer in writing.
What to ask
Put these questions to each roofer before you pick a date. Keep the answers together, and compare the words, not only the prices.
- Which lot or curb will the crew use for shingles, the trailer, and the dumpster, and who has said yes to it in writing?
- What are the hours of the nearby business on roof days, including weekday evenings, Sunday matinees, and early openings?
- If the lot is full at arrival, does the crew wait, stage at the curb and hand-carry bundles, or send the truck back?
- Who reschedules a shingle delivery that cannot unload, and what does a second drop cost you?
- Does the bid include a standby day if the staging spot is not available, and what does the contract say about who pays it?
- Who clears a plow pile or a stack of leaves from the staging spot before the crew arrives?
- Where will the permit card hang, and how will the crew keep the front walk open for an inspector?
A roofer who answers each question the same way every time gives you a usable comparison. A roofer who answers one of these with a shrug and a promise to figure it out on the day is telling you that the day will be run by the crew, not by the contract. Write the answers down, and keep them with the scope and the bid.