Chesterfield RoofingKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333
Every figure on this sheet is sourced

A Chesterfield Attached Garage Roof Tie-In Belongs in Writing Before You Sign

An attached garage meets the house roof at a joint many bids price vaguely. Here is what to ask each roofer to write down before you choose.

Sheet
A11
Subject
Storm record and statute
For
A homeowner after a storm
Trade
Roof repair, roof replacement

An attached garage usually has its own roof line, and that line meets the main house roof at a joint the bid has to name. On many Chesterfield homes the garage roof runs at a lower pitch, the eave sits at a different height, and the two slopes come together at a wall. When a bid says only "replace the roofs," the crew will decide the joint on the day they reach it, and you may not learn the price until the shingles are down. This page covers what the tie-in includes, where it tends to fail, and what to ask each roofer to put on paper before you choose.

What the tie-in actually is

The tie-in is the group of pieces where the two roofs meet. It usually includes step flashing or counterflashing where the lower roof meets the wall, a valley or a cricket where two slopes come together, the drip edge at the garage eave, and the ridge or hip where the lower roof stops against the taller one. Each piece is a separate material and a separate labor step. If a roofer prices all of it as one line called flashing, ask which pieces that line covers and which ones it leaves out.

The tie-in also decides what happens to the underlayment. The new underlayment on the garage roof has to lap correctly under the house roof, and the house underlayment has to lap over the garage roof at the joint. If either side is cut short, water that gets past the shingles has a path to the deck. You do not need to know the lap dimensions to ask about them. You only need the roofer to write them down.

Where the joint tends to fail

A garage roof at a lower pitch sheds water more slowly than the steeper house roof above it. Water sits longer at the joint, and in a St. Louis winter it has more chances to freeze there. Freeze and thaw cycles work into any gap at the counterflashing, and the wet spot often shows first on the garage ceiling along the wall that the garage roof meets. Homeowners usually see the stain inside and assume the problem is in the middle of the garage roof, when the leak started at the joint.

The weak points are predictable. Check the counterflashing into the brick or siding, the underlayment lap at the valley, and the eave edge where the garage drip edge meets the fascia. If the garage has a gable or a shed dormer that cuts into the house slope, the joint may have more pieces than the bid shows. Ask the roofer to point to each one on a photo or a sketch.

Questions to put in writing

  • Does the bid list the tie-in as its own line, with each piece named?
  • What metal and gauge is the counterflashing, and is it set into a reglet in the brick or fastened to the wall?
  • How far up the house slope does the new underlayment run, and how far down the garage slope does it lap?
  • Is the valley or cricket a separate metal piece, or is it formed from a cut in the field shingle?
  • Who seals the joint at the end of the day, and with what product?
  • If the garage pitch or height changes, does the bid say so, and does the permit drawing show the change?

Each answer should be short and specific. A roofer who says "we handle that" has not answered the question. A roofer who names the metal, the gauge, and the lap distance has given you something you can check against the other bids.

Check the permit drawing

A change in the garage roof pitch or height can affect the permit. Ask the permit desk that covers your address whether a roof change of that kind has to appear on the application or the drawing. Each roofer should say who pulls the permit and whether the drawing matches the bid. A mismatch between the drawing and the work in the field is hard to correct once the shingles are on, and it is easier to settle while the bid is still open.

Permit desks in St. Louis County and in the cities around Chesterfield keep their own hours and their own forms, so the questions that matter here are the ones you bring to them directly. Ask the roofer to tell you which desk they will call and what they will ask it. If the roofer cannot say, the permit step has not been planned.

What to do before the bid is signed

Ask each roofer to walk the joint with you. Stand inside the garage and look up at the ceiling along the wall where the two roofs meet, then go outside and look at the joint from the drive. Ask the roofer to point to each tie-in piece and say what it is made of. Write the answers down next to the bid line that covers them. If one roofer says the joint is included and cannot name the pieces, the bid is not finished, whatever its total.

Keys Roofing can walk the garage joint with you as part of the estimate visit, and you can call the office at (314) 220-2333 to set a time. Whoever walks it, keep the photos and the sketch with the bid so the joint can be checked later against the finished roof.

Why the joint matters on a Chesterfield lot

Many attached garages in Chesterfield sit close to the drive and to the side yard, so the crew's ladder line and staging area tend to run past the garage roof. A written tie-in plan also tells the crew where to stand and which slope to open first. When the joint is settled before the first nail, the crew does not have to improvise at the eave with the garage door open and the trucks at the curb.

The detail that is hardest to fix after the job is the one nobody wrote down. Ask for the pieces named, the laps measured, and the permit question answered in advance. Then compare the answers across the bids you collect, line by line.

Chesterfield, Missouri

Have the roof documented properly

Photographs, measurements and a written scope, produced by somebody who has been on the roof. What you do with the document is entirely your business.

(314) 220-2333

Roofing, gutters and downspouts only. Licensed and insured.

No obligation. A person calls you back.