A seasonal tree lot in a Chesterfield parking lot can fill the lane and curb your roof crew needs, so settle the turn before you book.

Sheet
A11
Subject
Storm record and statute
For
A homeowner after a storm
Trade
Roof repair, roof replacement

Tree lots show up in Chesterfield in late November. A shopping center lot or an empty corner of a commercial parking field gets a tent, a row of fir stands, a seller's trailer, and a delivery truck that arrives at odd hours. If your roof work is booked for the same weeks, that lot is now part of your roof plan, whether or not anyone on your street mentioned it.

The reason it matters is simple. A roof crew needs three things at the curb: a place for the dump trailer, a clear turn for the shingle truck, and a legal spot for the crew's own vehicles. A seasonal lot takes space from all three. It often takes them in the hours the crew needs most, because tree sales run through evenings and weekends, and the lot's delivery truck tends to come before dawn, when the shingle truck is also trying to get in.

Where the lot sits relative to your drive

Start with a map, not a memory. Pull up your parcel on the county's parcel viewer or on your own survey, and mark the lot that will sit closest to your house. Then mark the route the shingle truck will take from the arterial road. Many Chesterfield homes are reached through a single entrance from a busy road, and a tree lot beside that entrance can leave the trailer waiting in a turn queue with no room to stand.

Look for these three points on the map:

  • the exit the trailer will use, and whether the tree lot's delivery trucks share it
  • the curb or apron where materials can be set down without blocking the lot's entrance
  • any cones, tents, pallets or fencing the lot puts out at the edge of its property

Then walk the route yourself at the hour the crew plans to arrive. A Saturday at ten in the morning tells you very little about a Tuesday at six. If you can, do the walk once on a weekday and once on a weekend.

What to ask the roofer before you book

Ask each roofer which day they plan to set the trailer and which way the truck turns in. Ask whether the crew has driven the route since the tree lot opened, because a lot that appeared in November was not there in September. A useful answer names the exit, the time of the shingle drop, and the spot where the dump trailer will sit overnight, if it sits there at all.

Ask for the answer in writing. Keys Roofing can put the staging spot, the delivery window and the crew's parking on the written scope, with photos of the approach and measurements taken from the curb. That paper is useful if the crew needs to hold a line of cars for a few minutes, and it gives you something to show the lot operator. It does not replace a conversation with the lot operator, and it does not settle the lot's own hours.

What to ask the lot operator

A tree lot is a seasonal business, and most of them run on a short temporary approval, a lease with the shopping center owner, or both. Ask the operator for their hours, the day their stock arrives, and whether they keep a contact number that answers in the evening. If the operator will not give a number, ask the city whether the lot has a temporary use approval on file and what hours that approval sets.

Write down what you agree to. If the operator says the trucks come at six in the morning and will not move before the roof crew's first load, that is worth knowing before the trailer is parked. If the operator says the lot will be fenced off on weekends, check whether the fence leaves the apron and the turn open. A fence that closes the turn on Saturday can close the crew's only route on Sunday.

Chesterfield permits and the seasonal lot

Permit questions go to the city, not to the roofer and not to the tree seller. Ask the city's permit desk whether a roof permit is open for your address and what inspection dates are on it. Ask whether a temporary seasonal use on a neighboring commercial lot changes any hours or access rules that apply to a residential roof project. The answer may well be no, but get it from the city rather than assuming it.

If your roof is on a permit, the inspection stops have dates attached. A missed stop because the inspector could not reach the house is a real delay, and it can push the roof date by a week or more. Give the inspector a clear route, and tell the roofer which curb the inspector will use so the trailer does not sit across it.

What it costs, and what it does not

A seasonal lot does not add a line to the roof price on its own. What it changes is the schedule and the staging. If the trailer has to be moved because a delivery truck blocks the turn, the crew may lose half a day. If the crew must haul materials farther from the curb than the bid assumed, labor time goes up.

Ask each roofer how they price a day lost to a blocked approach, and whether that day is billed as a standby charge or simply pushed to a new date. Those are different answers with different costs, and the difference should be on paper before the crew arrives. Ask also what happens to shingle bundles that sit on the curb overnight if a delivery is late, since the bundles may need to wait somewhere safe.

On the day

On the morning of the work, walk the approach with the crew lead before the first load comes off the truck. Show them where the tree lot's fence line sits, where any cones are placed, and where the lot's own trucks turn. Take a photo of the curb at the start of the day. If the lot operator has moved a stand, a tent or a pallet into the crew's path, note the time and the change in the daily log.

Keep the homeowner's side clear as well. Keep your own driveway open for the crew's vehicles, and tell the neighbors that a trailer may be parked on the street for a day or two. If a tree customer parks in your drive by mistake, call the lot operator first and let the crew lead know who you called and when.

What to ask before you book

  • Which day the trailer goes down, and which day it leaves
  • Which exit the shingle truck uses off the arterial road
  • Whether the crew has driven the route since the tree lot opened
  • Who answers the phone on the lot during the roof window, and what hours they keep
  • Whether the staging spot is on your lot, on the apron, or on the street
  • What the roofer will do if a delivery blocks the turn for an hour

If the answers come back vague, ask for a start date after the lot has closed for the season, or ask the roofer whether the crew can work from a different approach. A roof crew that can name a second route is in a much better position than one that has only the tree lot's entrance to work with. Call (314) 220-2333 to talk through the route before you sign anything.

Chesterfield, Missouri

Have the roof documented properly

Photographs, measurements and a written scope, produced by somebody who has been on the roof. What you do with the document is entirely your business.

(314) 220-2333

Roofing, gutters and downspouts only. Licensed and insured.

No obligation. A person calls you back.