A Chesterfield Code Notice Can Name Your Roof Before the Bid

A written exterior notice from the city can put a roof on a deadline, so read its cited section and date before you call a roofer.

Sheet
A11
Subject
Storm record and statute
For
A homeowner after a storm
Trade
Roof repair, roof replacement

A letter from the City of Chesterfield about the outside of your house is a different thing from a sales call. It is a dated record with a cited section, a compliance date, and often a request for a written reply. If the notice names the roof, the gutters, the chimney flashing, or a sagging fascia, the work may have a clock on it before you have compared a single bid. This page explains what to read on that notice, what to ask the city, and what to put in front of each roofer before you choose.

Town roofing

Start with the paper itself. Note the date the notice was issued, the date of any compliance deadline, the address and parcel shown, and the code section cited. Keep the envelope. If the notice came by certified mail, keep the receipt or tracking record too. A notice that cites a section you can look up is easier to answer than one that describes a problem in general words.

Before anyone climbs, take dated photos of the area the notice names. Shoot from the ground first, then from a safe spot with a clear view of the cited slope or wall. Put a ruler or a known object in the frame when you can. Photos taken before the work give you a record of the condition when the notice was written, and they also show the roofer where to start.

Next, separate what the notice says is wrong from what a roofer thinks is wrong. A code officer may have written a note about loose or missing roofing material after looking from the curb. A roofer may find that the same spot is a failed flashing at a wall. Both can be true, but the city will check the item it cited, and the repair has to answer that item. Ask the city what the officer observed, and ask whether a reinspection visit is already scheduled. Do not assume a verbal extension covers the date printed on the page.

Chesterfield roof work also meets the permit question. A roof replacement or a major repair normally needs a permit and inspections, and the desk that handles a permit is not always the office that sent the notice. Confirm with the city which desk is handling the file, whether a permit is needed for the exact repair cited, and which code edition applies. Do not guess from a neighbor's job. Ask the city directly and write down the name of the person you spoke with and the date.

Weather matters here too. A repair that would normally wait for a dry, mild week may be needed before a deadline. In a St. Louis winter, freeze-thaw cycles can open a loose tab or a lifted flashing again after a patch that looked tight in November. If the notice gives a deadline in December or January, tell each roofer that date first, and ask what the crew does if the forecast turns cold on the day they are scheduled.

Keys Roofing works from a written scope. Keys documents the damage with photos and measurements, puts a written scope with those photos in the homeowner's hands, and attends as the contractor when the work is open. Keys does not handle the city's file on your behalf and does not speak for you to the city. You remain the person who responds to the notice. The office number is (314) 220-2333 if you want to talk through the scope before you send your reply.

What it costs

A code-driven repair is priced like any other roof repair until the city adds a requirement. Ask each roofer to split the number into three lines: the cited repair itself, the permit and inspection fees, and any work the notice does not mention but the crew finds once the area is open. The cited repair should be the smallest line. If it is not, ask what else is inside the total and why.

Permit fees come from the city's fee schedule, not from the roofer's quote. Some desks charge by job value, some by permit type, and a reinspection after a failed visit can carry its own fee. Ask whether the quote includes the permit fee, whether it is billed to you or passed through at cost, and who pays for a second inspection trip if the first one fails. A quote that leaves these lines blank has not priced the city part of the job.

If the notice cites a whole plane or a whole side of the house, ask for the price by the square or by the foot, and get the rate in writing. If it cites one spot, ask for a unit price for the repair and for the right to add to it if the crew finds more rotten decking or fascia once the old material is off. A written unit price keeps a small citation from turning into a surprise on the day the crew is already on the ladder.

Do not accept a lower number that moves a required item out of the bid. Required work belongs in the bid even when it is unpleasant to price. A bid that leaves out the flashing the city cited may look cheaper, but the second visit to fix it will cost you time and possibly another permit fee.

What to ask

Bring the notice to each roofer and ask the same questions in the same order. Ask which line of the notice their repair answers, and ask them to write that line back in their own words. A roofer who can name the cited item and the section it sits under has read the notice. A roofer who only says the roof will be fixed has not.

Ask who pulls the permit and whether the permit card will be posted at the house while the work is open. Ask how the crew will schedule the city's inspection, who calls the city for the final, and who receives the final inspection record. Ask for the date the repair will be complete and the date the crew will be ready for the city visit. These are different dates, and the city will look at the second one.

Ask who will be on site when the city visits, and whether that person can answer the inspector's questions about the cited item. A foreman who knows the scope can point to the repaired area and explain what changed. A salesperson who saw the roof once cannot.

  • Which line of the notice does your repair answer, and in what words?
  • Is a permit needed for this repair, and who pulls it?
  • What is the total including permit fees, and what is excluded?
  • If the city reinspects and the work fails, who pays for the return trip?
  • What photos will you give me before, during and after the repair?
  • If weather stops the work before the deadline, what will you put in writing?

Keep each answer. A reply by phone is not a record. Ask for the answer in email or on the written scope, and keep it with the notice in one folder. If two roofers answer the same question differently, write both answers down and ask the city which reading of the code it will apply.

Finally, ask what the repair does not cover. A repair to the cited flashing does not make an old roof new, and a notice about one spot does not replace the rest of the surface. You can decide to repair the cited item now and plan the larger job later, or you can use the notice as a reason to price a full replacement. Either choice should be made with the notice in front of you, the cited section marked, and a written scope from each roofer on the table.

Chesterfield, Missouri

Have the roof documented properly

Photographs, measurements and a written scope, produced by somebody who has been on the roof. What you do with the document is entirely your business.