A Parking Deck Next to a Chesterfield Lot Changes the Roof Plan
A parking deck beside your Chesterfield home can shade the roof, shed water toward your edge and set the hours a crew can stage on the street.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
A parking deck next to a Chesterfield home is not like a surface lot. The deck rises above the roofline on one or more sides, it has ramps and exits that move cars all day, and its owner usually answers to a property manager rather than to you. Those three facts change how a roof gets measured, staged and scheduled. If you are comparing roofing bids and the deck is within sight of your eave, these are the points to settle before a shingle is ordered.
Shade and the drying clock
A deck that stands higher than your house blocks sun for part of the day. On the side that sits in its shadow, the roof deck can stay damp well into the morning, especially after a wet week or a heavy dew in spring and fall. Crews need a dry deck before they nail down underlayment and shingles, so a shaded slope can push the start of the work back by hours or by a whole day. Ask each roofer which slopes they expect to be shaded and how they will decide the deck is dry enough to nail. A roofer who says they will just watch the weather has not thought about the shadow line.
Shade also changes what the shingles do after the job is done. A slope that stays wet longer tends to grow algae and moss sooner. That is a maintenance question, not a defect, but it belongs in the file so you know which slope to check first in a few years.
Water off the upper level
Parking decks shed water through their own drains, scuppers and expansion joints, and the layout decides where that water lands. In Chesterfield winters, deck surfaces are often treated with salt or de-icer during freezes. Meltwater and salt spray can run off the lower edge of the deck onto a fence, a gutter line or the top of your roof edge. Metal and fasteners near the deck edge are the first to show it. Before you choose a roofer, walk the lot line with a phone and photograph where the deck drains land. Then ask each roofer whether they will flash or detail the roof edge nearest the deck differently, and whether the bid names that detail on its own line.
If your roof is shingled with Atlas or Malarkey shingles, the product itself does not change because of the deck, but the flashing, the drip edge and the gutter outlets do. Those are the parts that take the runoff, so they are the parts the bid should describe in words you can check.
Staging and the truck route
A deck often takes up the space a roof crew would use for staging. The ramp may be the only paved route in, and the entrance may be marked for resident traffic only. Shingle pallets, underlayment rolls and the dumpster all need a flat spot within reach of the work. Ask whether the deck owner has been told about the roof job, and whether a written permission exists for trucks to use the drive, the curb or the lot edge. A verbal okay from a night attendant does not settle it.
Height matters too. A delivery truck with a lift gate, a dumpster on a roll-off truck and a lift used for tear-off all need clearance under any covered entry, sign or overhang that runs along the lot. Measure the clearance on the path your truck will take, not just the height of the deck. If the answer is that the truck cannot get in from the deck side, ask where it will park instead and how far the pallets will be carried.
Hours and the deck's own traffic
Parking decks run on schedules set by their owner. Events, shift changes, tenant move days and a busy lunch rush can all fill the spaces and the lane that a roof crew relies on. Some decks also have noise rules or limits on work during certain hours, and those can be stricter than the city's general rules for construction. Ask the deck owner or manager for the hours their staff and tenants use the area, then ask each roofer to write the start and stop times they will work around that schedule.
The deck also has its own foot traffic. Pedestrians cut across lots on the way to the stairs, and a crew working near the edge needs a cone line and a clear walk for those people. Ask each roofer how they will keep the walk clear without closing the entrance for the whole day, and who will stand watch when a crew member is on the roof.
What to ask each roofer
Put the deck questions in the same list as the rest of your bid questions, so you can compare the answers side by side. Ask which slopes they expect to be shaded, and how they decide the deck is dry before nailing. Ask which roof edges are closest to the deck's drains or scuppers, and how the bid handles flashing and gutter outlets there. Ask where the trucks will stop, what clearance they need, and whether the deck owner must sign off on the staging area. Ask which hours they plan to work and how they will handle deck events or shift changes.
Write each answer down. A roofer who answers all of these in writing gives you something you can hold them to, and one who answers with a shrug has told you what the rest of the job will look like. Keys Roofing can walk the lot with you and put the staging, drainage and shade notes into the written scope with photos and measurements. If you have a question about your deck, you can call the Keys office at (314) 220-2333 before you sign anything.