A Sloped Chesterfield Lot Changes How the Crew Reaches the Roof
On a sloped Chesterfield lot, the back roof can sit well above grade, so ask each roofer how the crew will reach it.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
If your Chesterfield lot drops away from the street, the roof you see from the driveway is only half of it. The back slope may sit one or two stories above a patio, a walkout or a grade you can walk on, and that changes how the crew gets up there, how far material has to travel, and where the tear-off debris can land. Most roof bids are written as if the house sits flat. On a sloped lot, that assumption can leave out the cost of getting people and shingles to the high side, and it can leave out a whole section of work nobody mentioned until the first morning.
Why the high side is the hard side
On many Chesterfield lots the front of the house is at street level and the back is raised on a foundation, sometimes with a deck or a basement entry at the lower corner. A roofer working from the front can see the front slope and the ridge line, but the rear slope, the rear valleys and the back edge of the gutter are often out of view. The crew has to reach them by ladder from the lower grade or by staging, and every trip up with a bundle of shingles or a pile of old felt is a trip the crew must plan for.
Steepness adds to the problem. A roof pitch that feels manageable from the ground can be hard to stand on once the old shingles are off and the deck is slick with morning dew or a light rain. Crews will often change the way they work on the high side, slowing down, adding fall protection and moving material in smaller loads. None of that is wrong. It does affect the day count and the crew size, and a homeowner should know whether the bid assumed it.
Ask how the crew reaches the back slope
Put the question in writing before you sign: where will the crew set the ladders, where will the staging or lift stand, and which parts of the house will they reach from which side. A good answer names the sides of the house. A vague answer, such as "we will get up there", leaves you to find out on the day. Compare the answers across bids. Two roofers may describe the same back wall in completely different ways, and the difference often tells you which one has walked the lot.
Ask whether the bid includes a lift or scaffold, and if it does, whether the rental, delivery and removal are included. On a sloped lot a lift may not fit between the house and the fence, or may need a stable pad on the grass that the lawn will not take well. A scaffold frame may need to be set on the slope with blocking. Those details change the cost, and they change what your yard looks like afterward.
Ladders, lifts and what each one costs your yard
A ladder costs little, but it has to stand on firm, level ground, and on a slope the feet need blocking or a second person to hold it. Ask where the ladder feet will sit and whether any plantings, sprinkler heads or landscape edging are in the way. Ladders also need a clear path for shingle bundles, which means carrying materials up the side of the house, not just placing a ladder where the truck happens to park.
A lift or scaffold is a larger commitment. It leaves ruts or dents on a lawn, it can crush a flower bed, and it needs room to swing. On a narrow side yard the crew may have to choose between a short lift that cannot reach the eave and a taller one that does not fit the gap. Raise that tradeoff early, and ask the roofer to mark the planned footprint on the ground with spray paint or flags before the materials arrive.
Where the bundles and the debris go on a slope
Shingle bundles are heavy, and they are usually delivered to the driveway or the street. On a sloped lot, getting them from the truck to the back of the house means a carry along the side of the building, up steps or along a path. Ask where the bundles will be staged, how they will be moved, and whether the crew will carry them or stage them at an intermediate point on the high side of the lot. The answer affects how long the work takes, and it affects how the grass and walkways look after the delivery trucks have come and gone.
Debris has the same problem in reverse. Old shingles and felt that come off a steep back slope slide downhill, and they can land in a flower bed, against a fence or in a neighbor's yard if the lot falls toward them. A roofer should describe how the debris will be chuted, caught or carried down, and where the dumpster or trailer will sit. If the dumpster has to go on a slope, the bid should say how it will be leveled and where the load will be hauled from. The bid should also say who cleans the yard once the work is done, including the small pieces of nails that end up in the grass.
What the ground needs before the crew arrives
Walk the lot yourself before the first delivery. Mark the back edge of the lawn, the planting beds, the outdoor furniture, the grill, the irrigation heads and any low electric or gas meters on the side wall. On a slope it is easy to forget that a crew working on the high side is standing above those things, and that a dropped tool or a loose shingle can roll a long way. Move anything that can be moved, and tell the crew where you want them to stay off.
If you have a deck or a walkout patio at the lower corner, decide whether it stays in use during the work. The crew may need to cross it, stage material on it or set a ladder against its rail. A deck can also take damage from shingle weight if bundles are stacked on it, so ask the roofer to keep bundles off any deck surface, or to place plywood under the load if they must stage there.
What to write into the proposal
A sloped-lot bid should carry a short set of plain statements. It should say which sides of the house the crew will work from, what equipment will be used on each side, where bundles and debris will be placed, who is responsible for lawn and planting repair, and what happens if the ground is too soft or too steep for the equipment that was planned. It should also say how the crew will protect the work area and whether the homeowner must keep the back gate open during the job.
Keys Roofing can walk the lot with you and put these answers in writing, with photographs and measurements of the back slope, so you are comparing the same site across bids. Keys attends the work as the contractor, and the written scope stays in your hands. If you have questions about the back of your Chesterfield lot before you book, call the office at (314) 220-2333.