Chesterfield RoofingKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333
Every figure on this sheet is sourced

A Subdivision Lake Behind a Chesterfield Lot Changes the Ladder Line

A lake-edge lot in a Chesterfield subdivision raises three questions about ladder footing, soft bank soil and the association's rules before roof day.

Sheet
A11
Subject
Storm record and statute
For
A homeowner after a storm
Trade
Roof repair, roof replacement

A lot that backs onto a subdivision lake changes the roof day in ways a flat yard does not. The water itself is rarely the problem. The problem is the ground between the house and the water, which is often a sloped bank of graded fill, a shared easement, and a set of association rules written for docks and boats rather than ladders and pallets. If you are deciding whether to book a roof on a house like this, the questions below are the ones that usually settle the schedule.

Town roofing

Some subdivisions around Chesterfield were laid out with a common lake or retention pond that the association owns or maintains. The lot line may stop at the top of the bank, the shoreline may belong to the association, and the recorded easement may let the association enter for maintenance. Those three facts decide where a roof crew can stand, and none of them is printed on a roof bid. A roofer walking the back of the house will see the bank. The plat, the declaration and the association's rules will say who controls it.

The bank is the first practical problem

Lake banks in this part of St. Louis County are often built up with graded fill. In a wet spring that fill can soften enough for ladder feet and stabilizer feet to sink or creep. A ladder that settles on a soft bank tilts toward the house during the day, which is exactly when the crew is working at the eave and carrying bundles up the slope. Ask where the ladder will stand, and ask whether the crew will set boards or pads under the feet. The answer belongs in the written plan, not in the foreman's judgment on the morning of the job.

Morning damp stays longer beside open water

Open water holds cool air close to the surface, and a lot beside a lake can stay damp on its north and east slopes well after the sun clears the trees on the far side. Wet shingles do not seal, and wet decking is not safe to walk. A crew that starts at seven on a lake lot may have to wait for the surface to dry, so the start time on the bid should say what happens when the deck is still wet at eight. A bid that says the crew starts at seven and says nothing else is leaving out the part that moves the calendar.

Wind over the water reaches the ridge

A lake gives wind a long run across open ground, and wind that crosses it can reach the ridge with more force than wind over the next lot. During tear-off the deck is exposed, and an afternoon gust can lift underlayment and loose debris before the crew can secure them. Ask each roofer what they do when the forecast shows gusts from the lake side, and whether the crew will dry in the day's work before the wind rises. The answer should name a wind speed or a time, not a general promise to be careful.

What it costs

A lake lot rarely changes the square count of the roof itself. It changes the labor. Extra time goes to carrying shingle bundles and felt rolls around a fence, a dock or a patio, to moving boards to the bank, and to a slower tear-off on a slope the crew cannot stage from. Those hours should appear as their own line in the bid, or they should be named as an allowance with a stated limit. A bid that lists site conditions without a number is not yet a comparison with another bid.

There may also be cost in protecting the bank. If the crew must cross a soft section to reach the back slope, plywood walk boards and a second person to spot the path add time and material. If the association requires a ground protection measure, meeting it costs something as well. Ask whether those items are inside the price or will be added later as change orders. A lower number that depends on a verbal promise to lay boards is not the same as a higher number that includes them.

Docks, seawalls and lakeside structures add another category. A covered dock, a boathouse or a lift near the eave can block the ladder line, and a seawall can limit where the crew can stand. Moving a dock section or a lift for a few hours is usually the owner's job, but the bid should say who books that work and who pays whoever does it. If a marina or a dock contractor must come out, that is a second appointment on the calendar, and it should be on the schedule before the roof start date is fixed.

Compare the bids side by side on these lines. Two bids for the same house can differ by a meaningful amount only because one of them priced the bank and the other did not. Put the items next to each other and mark which bid names each one.

What to ask

Start with the land and the easement. Ask each roofer, in writing, where they plan to stand and whether that spot is on your lot, on the association's shoreline, or inside a shared easement. Then ask your association whether roof crews need advance notice, a access permit or a certificate of insurance before they use the bank or cross the common area. Those are two different questions. A roofer can answer the first. Only the association can answer the second.

Ask for the ladder plan. Each roofer should say where the ladder stands, what the foot sits on, who checks the ground before it goes up, and what the crew does if the ground moves during the day. A good answer includes boards or pads, a check at the start of each day, and a rule for stopping work if the ladder shifts. A vague answer is also information, and you should write it down next to the other bids.

Ask for the morning rule. Get the start-time rule in writing: what the crew checks before nailing, who decides when the deck is dry enough, whether a late start is billed, and how the crew reports a delay to you that day. Ask how the crew handles a day cut short by wind off the lake, and whether the open roof is closed in before the crew leaves.

  • Where exactly is the ladder foot, and what is under it?
  • Whose land is the bank: yours, the association's, or a shared easement?
  • Does the association need notice, a permit or an insurance certificate before crew access?
  • What happens if the deck is still wet at eight?
  • Which bid lines cover the bank protection and the extra carrying time?
  • Who books and pays for a dock, lift or seawall that has to move?

Ask each roofer to write the answers into the contract or the scope, not only into an email. A scope that says the crew will use boards under the ladder feet and will wait for a dry deck is one you can hold a roofer to. A promise made on the phone is harder to check once the trucks are in the yard.

If you are weighing two or three roofers, do not let the lake settle the choice by itself. Ask each one the same questions in the same order, and note which answers come back specific and which come back general. Specific answers are the ones that survive the first wet morning.

Keys Roofing puts the answers to these questions in writing before a crew is scheduled, including where the ladder will stand and how the start-time rule works. The office line is (314) 220-2333. If you have a plat, an easement map or a copy of the association's rules, bring them to the first call so the back-of-lot questions can be answered from the paper rather than from memory.

Chesterfield, Missouri

Have the roof documented properly

Photographs, measurements and a written scope, produced by somebody who has been on the roof. What you do with the document is entirely your business.

(314) 220-2333

Roofing, gutters and downspouts only. Licensed and insured.

No obligation. A person calls you back.