A Subdivision Pool Lot Can Take the Roof Trailer's Spot
On summer weekends a subdivision pool lot fills early, so settle the trailer spot and truck route in writing before your roof date.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
A subdivision pool lot is a quiet piece of ground for most of the year and a crowded one from late spring into early autumn. Many Chesterfield subdivisions have a small gated pool with a paved lot for residents, and that lot can be the only flat, open paving within a block of your house. If your roof date falls on a warm weekend, the trailer, the dump bin and the shingle pallet may need a space that the pool crowd already expects to use.
This page is for the homeowner who has a roof date on the calendar or is close to setting one, and who has not yet asked where the crew will park. The answer is not always the street in front of the house. It can depend on who owns the lot, what the association allows, and what day of the week the work falls on.
What the pool lot takes away from the crew
A roof crew needs three things from the ground near the house: a place for the trailer or dump bin, a place where the shingle truck can stop long enough to unload, and a path from that spot to the eave. A pool lot can offer the first two on a weekday morning and lose them by midday on a Saturday in July. Families arrive with coolers and strollers, pool supply vehicles use the same drive, and cars park on both sides of any gap that looks wide enough.
The lot can also take the crew's path away. Pool fences, gates and fence panels between the lot and your yard may need to be crossed on foot with materials, and a gate that stays locked during the day cannot be used at all unless someone opens it. Ask who holds the gate code or key, and whether that person will be on site on the roof days.
Ask the association before the roof date is set
Pool lots usually belong to the subdivision, not to the street, which means the rules come from the association and its management company. Ask who owns the lot, whether a contractor vehicle is allowed to park or idle there, and whether a dumpster or trailer can be set on the paving even for one day. Some associations treat the lot as common property and will decline any equipment. Others will allow short-term use if the request is in writing and the crew keeps the drive clear.
Ask for the answer in writing, with a name and a date. A verbal yes from a board member who rotates off in the spring does not help a crew arriving in June. If the association manager is the one who answers, keep that email with your contract file so it can be found when the crew shows up.
Plan the weekday and the weekend separately
Pool traffic is light on weekdays before the school break and heavier once the season is in full swing. Weekends in late spring, summer and early fall are the times to expect the lot to be full, and a Saturday roof day in those months is the one likely to be blocked. A crew that plans to stage on the pool lot should say so in the bid and name the days it will use it.
Holiday weekends bring extra traffic, and so do swim meets and the pool opening and closing days. Those dates usually appear on the association calendar, which is often posted near the gate or sent by email at the start of the season. Ask for a copy and check the roof dates against it before you agree to them.
Where the trailer can wait instead
A lot that is closed to the crew does not always mean the job cannot happen. Look at the street frontage first. Many Chesterfield streets allow a work vehicle to park for the day if it does not block a driveway, a hydrant or a sight line, but some subdivisions post rules that limit parking or require a permit for a trailer. If the street is public, check the city's parking rules. If the street is private, the association answers that question too.
The driveway is the next option. A dump bin or trailer on a concrete drive needs the homeowner's agreement and a check that the drive can carry the load, and a gravel drive may not carry a loaded trailer at all. Ask the crew to walk the approach with you before the date is set, and ask them to show where the pallets will sit while the truck is unloading.
If the house sits on a corner, the side street may give the crew a second place to stage. That only works if the side street is also clear of pool traffic and the crew can reach the rear or side of the house without crossing the pool lot.
What to put in writing
- Who owns the lot the crew will use, and the name of the person who approved its use.
- The days and hours the lot is needed, with the specific weekends the crew will not use it.
- Where the trailer, the dump bin and the shingle pallets will sit, with a sketch or a dated photo.
- How the crew will move materials from the lot to the eave, and which gates or fences it will cross.
- Who moves a car or cart that is left in the drop zone on a roof morning, and who calls the owner.
- What the crew does if the lot is full when the truck arrives, including whether the date moves and who pays for an extra trip.
Ask the crew to repeat the answers back in their own words. If they cannot, the plan is not settled yet.
If the pool is closed for the season
A pool that is closed for the season is still a lot. Some associations close the gate and the lot in early autumn and open them again in late spring, which can suit a roof job scheduled in the cooler months. Winter work on a closed lot has its own problems, including ice on the paving and a gate that may be chained shut. Ask whether the lot will be cleared and whether anyone will open the gate for the crew. Freezing rain on a closed lot can turn the crossing into a slip hazard, and the crew should say how it will handle that before the first load moves.
Keys Roofing can walk through the lot plan with you before a date is booked. The office number is (314) 220-2333. Ask the crew for its parking and staging plan in writing, and ask the association for its answer in writing as well.