A Trumpet Vine on Your Chesterfield Brick Needs a Cut Plan Before Roof Day
Trumpet vine clings to brick and fascia with aerial roots, so decide who cuts it, who photographs the wall, and who pays before the ladder goes up.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
Trumpet vine looks like a summer ornament until a ladder goes up against the wall it has been climbing. Its aerial rootlets cling to brick, mortar, painted fascia, and the seams of vinyl, and they work into any gap they can find. On a Chesterfield home with a brick front and a side fence that has gone several seasons without pruning, the vine can be the thing standing between the crew and the eave. This page is for the homeowner who has a vine on the wall and needs to know who settles it before the tear-off starts.
Town roofing
Many Chesterfield homes built with brick or stone veneer have a planting bed along the front or side wall, and that bed is where trumpet vine tends to start. The plant puts up long woody stems that climb the wall and slide under the eave, holding on with rootlets that look like small brown hairs. When the crew has to set a ladder, lift a bundle of shingles over a flower bed, or strip the drip edge, every one of those stems is in the way.
The St. Louis freeze-thaw cycle matters here too. Dried stems get brittle in January and February and snap when touched, which can scatter pieces across the walk and into the planting bed. In wet weeks the stems hold moisture against the brick and the mortar joints underneath. A vine that has been left alone for years may have rootlets set into the joints at the top course of brick, right where the roof flashing meets the wall.
Chesterfield subdivision associations often set rules about plantings on shared walls, entry features, and common landscape areas. Removing a vine from a shared entry wall without approval can turn into a letter, the same way a tarp or a fence change can. The rules differ from one subdivision to the next, so read yours before anyone cuts anything that the community may consider part of the landscape.
Where the vine has climbed a privacy fence on the side yard, the question shifts from the wall to the fence boards. A trumpet vine that has grown through a fence is hard to separate from the fence itself, and the crew will want that line photographed before anything is pulled.
Before the cut
Photograph the wall from the places you would use for a roof photo set: from the drive, from each side yard, and from the back. Take close shots of the brick at the eave, the fascia joints, and any window trim the vine touches. These pictures show the wall before the vine comes off. They also show whether the rootlets were holding loose mortar or lifting a trim board, which matters if the wall looks different after the cut.
Measure how far the vine climbs and count the main stems at the base. A rough height and a stem count tell the crew how much will have to come down by hand and how much can be pulled in sections. Note any stems that cross the roof edge itself, because those stems will sit directly on the ladder line.
Decide the timing with the roofer. A cut made in the middle of the growing season leaves a plant that regrows quickly, so the vine may be sending new shoots back up the wall before the roof is finished. A cut made while the vine is dormant leaves stubs that are easier to see and to pull, but the stems are more brittle and can break into pieces that land in the beds. Either way, ask how the stems will be bagged and carried away, so the debris does not end up in the gutter, the planting bed, or the street.
Keep the vine off the roof itself. Stems that have been pulled across shingles can lift the granules and leave marks that look like wear. If the crew has to walk the eave while the vine is still attached, ask them to say where they will stand and what they will hold.
What it costs
Vine removal is not part of a roof price unless the bid names it. Ask each roofer whether the cut, the rootlets on the brick, the haul-away, and the wall clean-up are in the number. Also ask whether the bid assumes the homeowner removes the vine before the crew arrives. A bid that is silent on the vine leaves the cost unsettled until the crew is standing on the ladder, which is the worst time to settle it.
A vine removed by hand takes time. Old stems are heavy, and rootlets have to be scraped off brick with a putty knife or a wire brush. The wrong tool or too much force can take mortar with the rootlets, and then the wall needs repointing that nobody priced. Ask whether repointing of any joints disturbed by the vine is included in the bid or billed separately, and ask for that answer in writing.
The vine also adds days. A crew that has to work around a vine on the wall may need extra time to set the ladder safely, and that time belongs on the schedule. If the vine slows the start, ask how the bid handles the lost hours and whether a later start date changes the price.
Get the removal line priced on its own, not folded into labor. A separate line lets you compare two roofers on the same wall and see which one has counted the vine at all.
What to ask
Put these questions to each roofer in writing before you decide who sets the wall:
- Is vine removal from the wall in the bid, and does it include the cut stems, the rootlets on the brick, and the haul-away?
- If the bid does not include the vine, who removes it, and does that happen before the tear-off starts?
- Does the crew photograph the wall before and after the vine comes off, and will you get those photos?
- What happens to mortar joints or painted fascia that come off with the rootlets, and who repairs them?
- Does the vine sit on a shared wall, an entry feature, or a fence line that needs an association or neighbor approval first?
- If the vine is cut in winter, when does the crew expect to start the tear-off, and what is the backup date?
Keep the answers with the rest of the bid. A vine question often gets answered on a phone call and then forgotten by the time the crew arrives, so write down the name of the person who said it and the date they said it.
If you want to talk through your wall with Keys Roofing, the office number is (314) 220-2333. Ask for a site visit so the vine, the wall, and the ladder line can be walked together before the bid is final.