An Ice Storm Week Can Stall Your Chesterfield Roof Date

A winter ice storm can slow the city counter and the crew at once, so ask each roofer how the date gets reset and where the new one is written down.

Sheet
A11
Subject
Storm record and statute
For
A homeowner after a storm
Trade
Roof repair, roof replacement

A winter ice storm affects a Chesterfield roof job in two separate ways. It glazes the driveway, the street and the lot so the shingle truck cannot stop where the plan says, and it sends the paperwork side of the job into a slow week. The first problem is visible from the curb. The second is quieter, and it is the one that moves the start date by a week or more without anyone explaining why.

Town roofing

A roof replacement in Chesterfield runs on two calendars at once. The first is the roofer's own schedule, which covers the crew, the material delivery and the trailer or dumpster. The second is the city's calendar, which covers any permit that has to be issued before tear-off and any inspection that has to be booked before the new deck is covered. Most days those calendars agree. A storm that drops ice across the metro can put both out of step. Crews stop work when the surface is unsafe, and city offices can run short-staffed or close for a day while roads are cleared. Neither event is unusual in a St. Louis winter, and neither one means the roofer or the city has done anything wrong.

The homeowner's part is to find out which calendar controls the start. If your project needs a permit before the crew can lift a shingle, the start depends on the city's counter as much as on the roofer's crew. If the permit is already in hand and no inspection is due before the deck is covered, the start depends mostly on the roofer's weather rules and the delivery. Ask the roofer which one applies to your address. A roofer who knows the answer can tell you which step waits on the city and which step waits on the sky, and that split tells you who has to make the call when the date slips.

Why a storm week moves the start

Three things usually slip after a storm. The first is the shingle delivery. A supplier yard may close, or the truck may be routed around a closed road, so bundles promised for Tuesday arrive on Friday or not at all. The second is the crew. Most roofing crews will not put a ladder on a glazed pitch, and they will not work a tear-off in a hard freeze when felt and nails are brittle. The working window shrinks to the afternoons after the sun has been on the surface for a few hours. The third is the city step. A permit submitted on Monday may not be stamped until the counter reopens, and an inspection booked for Wednesday may slide to the next open slot.

None of these is a reason to drop the roofer. Each one is a reason to ask how the calendar gets reset and who writes down the new date. A reset in writing, with the new date, the cause and photos taken before the crew left, is the record you will want if the start moves a second time. Keys Roofing documents the site and puts a written scope with photos and measurements in the homeowner's hands, and a careful roofer should bring that same habit to a delay as well as to the original bid.

What the freeze does to the lot

Winter ground in Chesterfield is not one surface. The driveway may be concrete or asphalt, the side yard may be soft clay that held water through the thaw, and the back lot may have a low spot where meltwater pools and then freezes. A trailer that rolled in on dry gravel in October can sink a wheel in February. A ladder set on a frozen lawn can shift once the ground thaws by afternoon. The roofer should walk the route from the street to the eave on the day the crew returns, rather than relying on the route they walked at the first visit.

Old concrete on a Chesterfield drive often shows freeze and thaw damage as scaling along the surface and small cracks at the edges. A shingle truck or a loaded trailer can make those cracks worse. If the approach is already damaged, the homeowner should know before the first bundle comes off the truck, and the roofer should say where the load will stand. Photograph the drive and the apron before the crew arrives so that any cracks already there are on record.

What it costs

A reset does not have to cost money, but it can. A crew that stands down for several days still has labor that has to be scheduled somewhere, and the roofer may have paid a delivery driver or a trailer company for a day that did not produce work. Materials staged on the lot may need to be covered, moved or returned. If the start moves past a date you chose, the question is whether the price changes or only the calendar. Those are different answers, and a bid should state which one applies.

Ask the roofer to put the terms of a schedule change in the bid or in a written change order before the date moves. A verbal note that the crew will come back when the weather allows is not a contract term. A written term that says whether the price holds when the start moves for weather, and names what counts as weather, gives you something concrete to compare against the next roofer's quote.

What to ask

Before you accept a start date for a Chesterfield roof this winter, put these questions to each roofer and keep the answers in writing:

  1. If the city counter closes after an ice storm, which permit or inspection steps move, and who tells you when they do?
  2. What is the crew's rule for stopping work on an icy roof, and how is the date reset when they stop?
  3. Where does the shingle delivery wait if the road into the lot is closed, and who pays for a redelivery?
  4. How is an open section of roof covered before the crew leaves for the day?
  5. Does a moved start change the price, or only the calendar, and where is that written?
  6. Who sends you the new date, in what form, and does it come with photos from the day the crew left?

Write down what each one says. A roofer who answers the first question with a specific step is giving you more information than one who says the date will be fine. Keep the answers in the same file as the bid, and call (314) 220-2333 with any question about a Keys schedule.

Chesterfield, Missouri

Have the roof documented properly

Photographs, measurements and a written scope, produced by somebody who has been on the roof. What you do with the document is entirely your business.