A roof job in Chesterfield usually starts with a question about the driveway, and then the question moves to the curb. The dumpster has to go somewhere. The trailer that carries the tear-off crew's tools has to park somewhere. The shingle pallets have to wait somewhere that is not wet clay. Many homeowners assume that the strip of grass and concrete between their property line and the pavement is theirs to decide about. Often it is not. The space between the sidewalk and the curb, and sometimes the lane beyond it, belongs to the public right-of-way, and whether a container or trailer may sit there is a question for the city, not for the roofer and not for the homeowner alone.

This page is for the homeowner who is partway through a decision and needs one specific fact: whether the street side of the job can be used the way the bid assumes. The answer depends on the street, the season and the rules the city applies that week, so the useful step is to ask before the bid is signed rather than after the bin is already in the road.

Why the street side matters on roof day

A residential re-roof produces a large volume of old shingles, underlayment and nails in a short window. Most crews stage a container close to the house so that debris can be carried a short distance from the eave. Where the driveway is short or sloped, or where the side yard is narrow, the container often ends up at the curb. A trailer for the shingles and tools has the same problem. If the bid says the container will sit on the driveway but the driveway is too short, the crew will look for the nearest open spot, and that spot may be the street.

The same goes for the trucks. The delivery of shingle bundles is a heavy vehicle that needs room to stop, unload and leave. On a Chesterfield street with parked cars on both sides, the truck may need to stop in a travel lane for a few minutes. That is a traffic question as well as a permit question, and it is one of the reasons the crew should name the stop point in writing before the day arrives.

Keys Roofing can tell you where it expects to put the container, the trailer and the pallets, and it can mark those spots on a photo of your lot. The photo and the note go into the written scope so that you can check them against the street and the city rules before anyone loads a truck.

What to ask the city

Start with the questions the city can answer. You do not need to phrase them as legal questions. A short written email or a call to the right desk is enough, and the answer you get is more useful if it is in writing. Ask whether a container, a dumpster or a trailer may be placed in the right-of-way at your address, and whether a permit is needed for that. Ask whether the stop point for a delivery truck needs any notice, and whether a lane may be partly blocked for the length of a delivery. Ask what hours apply to work in the public street, if any. Ask who to call if a neighbor complains while the work is underway.

Write down the name of the person who answers, the date, and the answer in plain words. If the answer is that a permit is needed, ask how long it usually takes to issue and whether a fee applies. If the answer is that the space is not available on the days you need it, ask what alternative the city would accept. The roofer may already know the answer for your block, but the city's answer is the one that counts when a parking officer or a public works crew arrives.

The desk you call may depend on the kind of work. A question about the pavement itself, such as a curb cut or a driveway apron, goes to a different office than a question about a container on the street. If the first desk sends you elsewhere, keep the transfer name and number in your file. The point is to end with a yes, a no or a stated condition, and to have it in writing before the bid is accepted.

What to ask your roofer

Once you have the city's answer, put the same questions to each roofer you are comparing. Ask where the container will sit and how the crew will get it there. Ask where the trailer will park and whether it will sit overnight. Ask how the shingle delivery will stop, how long the truck will stay, and whether the crew will need a lane closed. Ask whether the crew will cone or sign any part of the walk to the front door. Ask who sets out the cones and who picks them up.

Compare the answers against each other, not only against your own wishes. A roofer who says the container will go on the driveway but does not mention the length of the driveway has not answered the question. A roofer who says the delivery will stop at the curb and does not say whether the truck will block a lane has also left something open. Write down every spot that is not settled, because an open spot on the street tends to become the crew's decision on the morning of the job.

Ask each roofer for a photo of the street frontage with the proposed spots marked. A marked photo is easy to check against the city's answer, and it shows whether the roofer has actually looked at your block or is working from a standard plan. If one roofer offers a photo and the other does not, weigh the gap in writing rather than assuming the silent one has a plan.

What goes in the written bid

The written bid should name each staging spot and say whether it is on your property, in the right-of-way, or on a neighbor's frontage. It should say who is responsible for any permit the city requires and who pays the fee. It should say who sets out cones or signs, who removes them and when. If the crew will need a lane or a portion of the curb for a delivery, the bid should say so and name the date. These are not decorations on the contract. They are the lines that decide whether the street is usable on the day the work starts.

The bid should also say what happens if the city's answer changes after the contract is signed. A permit that was not needed last spring may be needed this year, and a delivery stop that was allowed on a Tuesday may be restricted on a school day. Ask how the roofer will handle a change and whether the change will move the schedule or the price. Get the answer in writing, with a date.

Keys Roofing puts a written scope with photos and measurements in the homeowner's hands. That scope includes the staging plan for the street. If anything in it does not match what the city told you, call the office at (314) 220-2333 before the crew arrives, and the question can be settled on paper rather than in the middle of the work.

Where the answer is kept

Keep the city's answer, the roofer's staging plan and the marked photo in one folder. When the truck arrives, the folder is the reference. If a neighbor asks why the trailer is parked where it is, you can point to the answer. If a city worker stops by, you have the record. A few minutes spent on the street side before the bid is signed is much cheaper than moving a loaded container on the afternoon of the tear-off.

The right-of-way is not an afterthought on a Chesterfield roof job. It is a line in the plan, and it deserves the same care as the shingle spec and the nail pattern. Ask the city, ask each roofer, and write down what each one says.

Chesterfield, Missouri

Have the roof documented properly

Photographs, measurements and a written scope, produced by somebody who has been on the roof. What you do with the document is entirely your business.

(314) 220-2333

Roofing, gutters and downspouts only. Licensed and insured.

No obligation. A person calls you back.