Chesterfield Hilltop Roofs: Pick the Edge Metal Before the Wind Does

On an open Chesterfield ridge, the edge metal and the fastening spec decide how the roof survives the wind, so name both before you sign.

Sheet
A11
Subject
Storm record and statute
For
A homeowner after a storm
Trade
Roof repair, roof replacement

Chesterfield has many roofs on open ground. Subdivisions on the higher parts of town, and newer lots where the builder cleared the trees, sit in wind that a wooded lot never sees. When a homeowner gets a roof bid for one of these houses, the shingle line is usually the first thing on the page, and the edge metal is often a single line with a dollar figure. That line decides how the eaves, rakes and ridges hold up when wind comes across the top of the hill. This page covers what to ask about the metal at the edges, and why the answer belongs in writing before the shingles are ordered.

Why an open lot changes the edge

On a wooded lot, the trees break the wind before it reaches the roof. On a cleared lot, the wind reaches the eave and rake close to full strength, and it lifts the edge first. The shingle field is held down by nails and sealant strips across its whole area, but the outer courses carry the most uplift. A shingle at the rake with a weak edge or a short nail line can start to lift, and the next gust pulls the metal behind it loose. This is why roofers treat edge metal as a wind item, not only a drainage item.

Storms reach Chesterfield from more than one direction across a year, and a single roof can take a hard push from one side and a glancing blow from the other. A roof that faces the wind on one plane and sits lower on another needs a spec that says what happens at each edge. A line that reads drip edge included does not tell you whether the metal was chosen for the exposure or simply because it was the cheapest piece on the supplier's shelf. The homeowner has no way to tell from the total alone. The spec has to name the piece.

The same logic applies to the sides of the house that face the open lot. The wind that reaches the rake is often stronger than the wind that reaches the eave, because the gable end catches the gust as it rises over the slope. If your house has a gable facing the open side, ask each roofer which rake metal they would use there and whether it differs from the piece on the back side.

The three edge pieces to name

Most asphalt roof bids cover three edge pieces. Each one should be named by type, length and fastening method.

  • Drip edge at the eave. Ask for the profile, the metal and the flange width. Ask where the flange sits relative to the sealant strip and whether the nails go through the flange or the face.
  • Rake edge. This is the sloped edge at the gable, and it is where wind-driven rain and wind lift find the first gap. Ask whether the rake metal is a separate piece from the eave metal and how far it laps.
  • Ridge and hip caps. These sit where two planes meet and take the most heat and wind on a hilltop. Ask how many caps per foot and what nail pattern holds them down.

Keys Roofing installs Atlas and Malarkey shingles, and each line has its own nailing zone and sealant guidance printed on the wrapper. Ask the crew to show you the nail line on a sample before the first course goes down. A nail placed above the printed zone holds less than the same nail placed inside it, and a sample board shows the placement faster than any written description will.

What the nails and sealant should say

Nailing is where many wind problems start. A bid that says nail per manufacturer without a count is a bid you cannot check. Ask for the number of nails per shingle, the nail length and the penetration into the deck, and whether the crew uses a coil or strip nailer, since the two feed differently and can set nails at different depths. Ask who checks nail depth on the first day and whether you can see that check. The answers should match the product wrapper, and they should also match the installation sheet packed inside the bundle. If a roofer's answer contradicts the wrapper, the wrapper wins, and you should ask the roofer to explain the difference in writing.

Sealant strips need warm weather to bond. In a Chesterfield spring or fall, a cold morning can leave the strip unbonded until the afternoon sun reaches the roof, and a shingle that has not sealed is a shingle the next wind can lift. A good bid says what the crew does on a cold day, whether they hand-seal the tabs that will be most exposed to wind, and who checks that before the crew leaves the roof. Ask whether the hand-sealing is included in the price or billed as a separate line, because on an exposed lot it can add up to a meaningful share of the labor.

Ice and the north eave

Hilltop lots also thaw slowly. The north-facing eave can stay frozen for days while the south slope is clear and dry, and that split is normal in a St. Louis winter. Ice at the eave lifts the lowest courses and can push water up under the drip edge. If the drip edge sits too low, or the starter course is not sealed to the deck, that water finds the fascia and then the soffit. The freeze and thaw cycle repeats across a Missouri winter, so the stress on the eave is not a one-time event but a yearly load that the spec has to plan for.

Ask each roofer where the ice and water membrane starts and stops at the eave, and how far up the deck it runs. A membrane that stops at the wall line will not protect a valley or a dormer cheek that channels water into the same spot. Ask whether the membrane is applied over the full north eave or only at the risky points, and ask how the membrane is lapped at the drip edge. Those answers tell you how much of the eave is protected and how much is left to the shingles and the nails.

Questions to put to each roofer

  1. Which edge metal profile do you specify for an exposed lot, and why that one?
  2. How many nails per shingle, what length, and where in the nailing zone?
  3. Is hand-sealing on a cold day included in my price, and who checks the seal before you leave?
  4. Where does the ice and water membrane start and stop at the north eave?
  5. Will you show me the nail line on a sample board before the first bundle goes on the roof?

Write each answer down beside the question that drew it. A roofer who answers all five in writing has given you a spec you can compare against the others. A roofer who answers in general terms, or who says the crew always does it right, has given you a sales line, and a sales line does not tell you what will be on the roof in the next wind.

What this does not cover

Edge metal and nail patterns do not decide whether a roof will survive a particular storm, and no spec removes the risk of a hard wind on an open lot. Missouri does not license roofers at the state level, so a roofer's spec is only as good as the crew that follows it and the owner who checks the work. If you have questions about your own address, call Keys Roofing at (314) 220-2333 and ask for the wind and edge details to be written into the bid. Missouri law (RSMo 407.725) bars a roofing contractor from representing or negotiating a homeowner's insurance claim, and from saying anything about paying, waiving or covering a deductible, so any claim questions go to your own insurer. The contractor's part is to document the roof, put a written scope with photos and measurements in your hands, and attend as the contractor while you deal with your own insurer.

Chesterfield, Missouri

Have the roof documented properly

Photographs, measurements and a written scope, produced by somebody who has been on the roof. What you do with the document is entirely your business.