Chesterfield Leaf Piles Can Take the Roof Crew's Staging Spot
Leaf pickup at the curb can crowd the trailer, the shingle pallets and the tear-off debris, so settle the staging spot before the first bag is raked.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
Chesterfield lots sit under large oaks, maples and sweetgums, and in the fall those trees drop their leaves onto every curb, parkway and driveway apron in the same few weeks. When the roof is coming off, those same stretches of curb and apron are where the old shingles, the new bundles and the trailer want to sit. A leaf pile that looks harmless on a Saturday can take up the one strip of street or driveway your roofer was counting on for the day.
Why the curb matters on a roof day
A roof job uses the front of the lot in a predictable order. The crew needs a place for the trailer or dumpster, a place for the shingle pallets when the truck drops them, and a spot near the house where tear-off debris can sit until it goes into the bin. Most of that space is the driveway apron and the grass strip between the sidewalk and the street. Leaves fill that same strip in October and November, which is exactly the stretch of the calendar when many Chesterfield roofs get replaced before the first hard freeze.
Leaves are not only a nuisance to look at. Wet leaves stick to the paper wrap on a shingle pallet and to the bottoms of boots, and they can hide a nail, a fastener or a dropped piece of flashing in the grass. Dry leaves blow across the drive whenever a truck door opens. A pile pushed against the curb can also hide the lip of a storm drain inlet, which matters when the crew is washing dust off a tarp or a dumpster lid.
Ask the city about the leaf schedule first
Leaf collection in Chesterfield runs on the city's own calendar, and that calendar can change from one year to the next. Do not rely on last fall's schedule or on what a neighbor remembers. Call the city office that runs leaf and brush collection and ask two things: which weeks the crew comes down your street, and whether piles must be kept clear of the right-of-way between collection days. Write the answers down with the date and the name of the person you spoke with, and keep that note in the same folder as the roof paperwork.
The collection schedule matters because a roof job can run for more than one day. If the city's truck is due on the second morning, the trailer may need to move out of the way while the truck works the block. A bid that says nothing about that move leaves the homeowner guessing when the trailer will leave the apron and when it can come back.
Measure the space before the crew arrives
Walk the front of the lot with a tape before anyone books a day. Measure the width of the driveway apron, the depth of the grass strip between the sidewalk and the curb, and the distance from the curb to the nearest mailbox, hydrant or utility box. Note where the power pole and the street sign sit. A trailer needs room to turn in and room to pull out, and a leaf pile that narrows the apron by a foot can turn a simple turn into a multi-point maneuver that nobody planned for.
Take photos of the same stretch at the same time of day, and date them. The photos show the leaves as they lie before the crew arrives, so there is no argument later about what was already there. If the roofer later asks to park in a different spot, the photos make it easier to decide whether the new spot is clear.
What to put in the roof bid
A written roof bid should say where the crew will stage materials and where the debris goes. If the bid says only that the crew will stage on the street, ask the roofer to name the spot in the scope. A useful answer names the apron section where the trailer parks, the grass or plywood area where the pallets are set, and the spot in the front lot where the dumpster or debris pile sits. The bid should also say what happens if leaves or collection work land in one of those spots on the morning of the job.
Keys Roofing documents the site before the work starts, then puts a written scope with photos and measurements in the homeowner's hands. That written site plan is the place to see the staging spots drawn out, so the homeowner can check them against the street and the apron before the first bundle is unloaded.
Questions to ask each roofer
- Which exact stretch of curb or apron will the trailer use, and how long will it sit there?
- Who clears leaves from the staging spot on the morning of the roof day, and whose cost is that in the bid?
- If the city collects leaves during the job, will the crew move the trailer, or will they wait for the truck to pass?
- Will the crew rake, blow or sweep the tear-off debris at the end of each day, and where does the swept material go?
- Where will the shingle pallets land, and what will they sit on if the grass is soft or wet?
- Who is responsible if a wet leaf pile causes a fall on the curb or a pallet slides off its base?
Storm drains and the leaf pile
Storm drain inlets along Chesterfield streets collect the leaves that wash off the lawns and the gutters during rain. A roof job generates grit, and that grit moves toward whichever inlet is lowest. Keep leaves off the grate, and ask the roofer to keep washdown water and tear-off grit away from the inlet. A storm drain is not a dump for old shingles or for the sweepings from the day's work, and a clear plan for that keeps the inlet from clogging just as the rains of the season begin.
Shingles, pallets and the wet pile
Keys Roofing installs Atlas and Malarkey shingles. Those bundles arrive on pallets, and a pallet should not sit directly on wet leaves or on soft grass that holds water. Ask where the pallets will land and what they will sit on. Plywood or a clean, flat section of concrete keeps the bundles dry and keeps the crew from stepping on loose leaves while they carry bundles to the ladder. The homeowner should also ask whether the pallet wrap will be checked for water before the bundles are carried up. A pallet that has sat in a leaf pile through a rain can carry moisture into the bundle, and that is a problem nobody wants to discover on the roof.
When the leaves are already down
If leaves are already on the ground when the crew arrives, the written plan should say who clears the staging spot and when. The homeowner may prefer to rake the apron before the roof day, or may want the crew to blow the leaves off the staging area as one of the first tasks. Either approach works. What matters is that the bid names the spot, the time it gets cleared and the person doing the clearing, so the crew does not find a pile in the middle of the morning when the trailer is already on the street.
Leaves also hide the edge of the apron, and a trailer can settle unevenly on an edge it cannot see. Sweep the staging spot before the trailer arrives, and sweep it again after the last load leaves. That routine takes a few minutes, and it leaves the street and the apron in the same condition they were in before the job began.
For a dated answer about how Keys plans the staging area on a Chesterfield lot, call the office at (314) 220-2333. Ask for the written site plan with photos and measurements, which shows the trailer spot, the pallet spot and the debris spot before the first nail is set.