Chesterfield Lots Near Spirit Airport Need a Hoist Check
If your Chesterfield lot sits near Spirit Airport, ask whether a roof hoist or crane needs a federal notice before the crew sets it up.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
If your Chesterfield lot sits under or near the approach to Spirit of St. Louis Airport, the roof crew's equipment list is a question for the airport as well as for you. Most roof jobs in town run on ladders, a dumpster, and a truck at the curb. A few do not. A tall material hoist, a crane that lifts bundles to a steep roof, or a boom lift parked at height can reach far enough into the air to matter to flight operations. The roofer should know that before the trailer rolls in, and you should know it before you sign.
Why the airport belongs in the roof conversation
Spirit of St. Louis Airport sits in Chesterfield. The land around it is a mix of business parks, industrial lots, and residential streets close enough that some homeowners see planes low overhead on approach. Living near the airport does not by itself change a reroof. What changes the job is equipment that stands high enough, or sits close enough to the runway, to fall under federal review. The question is not whether the airport is nearby. The question is how high the equipment goes and where it stands.
Which equipment can trigger a notice
For a standard shingle tear-off and reroof, the crew works from ladders, a dumpster, magnetic sweepers, and hand-carried bundles. None of that usually raises the question. A crane or a hoist does. The Federal Aviation Administration asks for notice of proposed construction and of cranes and similar equipment that could reach certain heights or sit near an airport's approach surfaces. The filing is made on Form 7460-1, and the answer depends on the height of the equipment, its distance from the runway, and the ground elevation of the lot. A roofer cannot answer those questions from the curb. The equipment supplier, or the person who runs the hoist, should have the numbers, and they should be able to write them down.
Ask also whether the crew plans to use a lift that rises above the eave, even briefly. A lift that is only used for a day can still be a tall object for the day. A roofer who says the equipment is small may be right, but the height at its highest working point is the figure that matters, not the size of the machine on the trailer.
What to ask each roofer
Ask three things, and ask for the answers in writing. First, does the bid use a crane, a hoist, or a lift that reaches above the roofline, and how tall will the equipment stand at its highest point? Second, has the contractor or the equipment company checked whether a federal notice is needed for this address, and who files it if one is? Third, what happens if a notice is required and the answer does not come back before the date you chose? A notice takes time to process. A roof date that depends on an answer nobody has yet received is not a fixed date, and it should not be written as one.
Keep the answers short and specific. A reply that says the crew will handle the airport part is not an answer. A reply that names the equipment, gives its height, and names the person who filed or will file the notice is one you can check.
- The equipment type and its highest working height, written into the scope
- Who checked the notice question, and on what date
- Who files any notice, and who carries the cost of a delay if one is needed
- The start date the crew will hold if the answer is still pending
Ground, approach and the lot itself
Even when no notice is needed, a lot near the airport changes how the crew sets up. A boom lift or a tall hoist parked in a side yard takes up room, and it has to clear overhead wires, the eave, and any trees that lean toward the house. The ground matters too. A lift outrigger or a hoist base needs firm footing, and Chesterfield's clay holds water after a wet week and softens in spring thaw. A stand on soft clay can settle during the day, which is the last thing a crew wants on a steep slope. Ask where the equipment will stand, what the ground under it is, and whether the crew will put plates or mats under the legs.
Ask also how the equipment comes off the lot at the end of the day. A crane that is folded and staged in the street needs the same right-of-way answer as a dumpster does. A crane left standing overnight raises a different question entirely, and the roof bid should say which one applies.
What a written answer protects
A written answer on the equipment protects you in two ways. It tells you whether the roof date is realistic before you have paid a deposit. It also gives you a record if a neighbor, the airport, or the city asks what was standing in your yard on a given day. Keep the reply with your roof file, along with the scope, the photos, and the measurements the crew takes on its first visit.
Keys Roofing can write the equipment list into the scope so you can read it before you sign. If you want to ask about a crane, a hoist, or a lift on your lot, call the office at (314) 220-2333 and give the street address first, because the address decides how close the lot sits to the approach. Keys will still need the equipment height from the crew before the answer is final, so the question is worth asking early, before the start date is set.