Chesterfield Roof Inspection Stages: Ask Which Ones Your City Runs
Ask the city which roof stages it inspects, when the deck must be open, and who books each visit before the crew starts tear-off.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
A Chesterfield roof job is a sequence of stops, not one inspection. Between the signed contract and the final check, the work passes through several points where the crew may need to stop, wait, or show something to someone outside the company. Some of those points are set by the city's permit desk. Others are set by the roofer's own habits, and a homeowner who has never heard them named may assume they do not exist. Before the first shingle comes off, a homeowner should know which stops the city expects, which ones the crew plans on its own, and who writes each one down.
Town roofing
Permits for a residential reroof are issued through the office that covers the address, and in Chesterfield that is not always the place a homeowner would guess from the mailing address. Start by confirming which office holds the permit for the parcel. Then ask that office how it names its stages and when it expects to see the work. Desks use different words for the same moment. One may say rough, another may ask for a look before the deck is covered, and a third may only ask for a final. A roofer who uses one set of words while the desk uses another can leave a homeowner thinking a stage was passed when it has not been scheduled at all. Write down the desk's own names and bring them into every conversation with a roofer.
The stop that matters most is the one when the old shingles are off and the deck is bare. This is the point where soft or rotted sheathing becomes visible, and it is when a crew decides which boards to replace and which to leave alone. Ask whether the permit calls for anyone from the city to see the deck at that stage, or whether the crew's own check is enough for the desk. Either answer is possible in a given case, so the homeowner should confirm it rather than assume it. Ask also how a soft spot is recorded, who approves the replacement, and where the photo of the spot ends up.
Spring brings a second kind of stop. St. Louis rain can leave a deck looking dry from the driveway while moisture is still held in the wood below the surface. Underlayment nailed over damp sheathing traps that moisture against the shingles, and the problem often shows up months later as staining in the attic. Ask each roofer what dryness check the crew runs before the underlayment goes down, and whether that check is written into the schedule or left to the foreman's judgment on the morning of the job.
Winter brings a third. A sealant strip that does not bond in cold air will not hold a shingle down, and a roof left open overnight during a freeze needs a plan for the deck, the attic and the tarp. These are not city inspections, but they change which days the crew can work and when the city's visit can be booked. A homeowner who knows the sealant limit and the permit calendar can avoid a stop that leaves an open roof sitting over a weekend.
Ask the desk how far ahead an inspection must be requested and how far apart the visits can fall. A visit requested on Monday may not happen until later in the week, and a crew with an open roof has to decide whether to keep working, stop, or cover what it has. That decision should be settled in the contract before the day it comes up. The city will not write it for you.
What it costs
Inspection stops are seldom a separate line on a reroof bid, but the time they take is real. A crew that waits on a visit still has a crew on the lot. A failed stage can mean a second visit, and the desk may charge a re-inspection fee on top of the original permit. Many desks set permit fees from the job's valuation rather than from the number of shingles, so the permit line on one bid can differ from another for reasons that have nothing to do with the crew. Ask the desk for its fee schedule, then compare it with the permit line in each bid.
Check whether each bid assumes a deck look, a look before the deck is covered, and a final, and whether a second trip is priced. A bid that says only permit included is hiding the count. Ask each roofer to name the stages their price assumes and how many visits that means. Keys Roofing can put the stages it plans into the written scope, which gives the homeowner one list to hold against the city's own list. Calls to Keys go to (314) 220-2333.
Ask also who pays a re-inspection fee if a stage fails. The question sounds small, but it is where a second visit becomes a second bill. A roofer who answers in writing is easier to hold to the answer than one who gives it on the phone.
What to ask
- Which office issues the permit for this parcel, and what is its line for scheduling inspections?
- What stages does that office name, and in what words?
- Does the permit call for an inspection when the old roof is off and the deck is bare?
- How far ahead must an inspection be requested, and how far apart can the visits fall?
- What dryness check does the crew run on the deck before underlayment goes down?
- What cold-weather limit does the crew use for sealant, and what happens to an open roof overnight?
- Which stages does each bid assume, and how many visits does that mean?
- Who pays a re-inspection fee if a stage fails?
- Where is each soft spot recorded, and who signs off on the replacement?
Where the list lives
The stage list belongs in the same folder as the contract. Keep the desk's names for each stage, the date each visit was requested, and the date each one happened. A homeowner who keeps those in one place will not have to rebuild the sequence after the roof is on. Ask each roofer to write the stages into the schedule, and read the schedule back before the crew arrives. If the schedule shows a visit on a day the desk has not confirmed, the schedule is wrong, and it is better to fix it before the trucks are booked.
A roofer who cannot name the stages should not be the only one holding them. The homeowner's copy is the one that matters when a visit is missed, a stage fails, or the crew changes. Keep it current, date each entry, and ask the roofer to initial any change made to it.