Chesterfield's Long Lots Stretch the Roof Crew's Power and Water Run
On a wide Chesterfield lot, the outlet and hose bib can sit far from the eave, so settle the power and water route before the crew books.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
A Chesterfield home on a wide lot can sit a long way from the street, and the far end of that lot is where the roof crew has to plug in its tools and draw water. The outdoor outlet may be on the back corner of the house, the hose bib may be on the side wall, and the nearest spot for a generator may be across a patio. None of that appears on a roof estimate unless someone asks for it, and it decides how far a cord or a hose has to reach before the first shingle goes down.
Town roofing
Many Chesterfield subdivisions were laid out with deep rear yards, side yards with a few feet of clearance, and driveways that run to a side-loaded garage. A roof crew working on the back slope may need power for a compressor, a nailer, a saw, and a chalk line, and it may need water for dust control and for the crew. On a small urban lot the answer is short. On a wide lot the answer is a run of cord or hose that crosses a flower bed, a patio, or a walk, and each of those is a place where something gets stepped on, tripped over, or left in the wet.
Ask where the power comes from. There are three common answers. The crew may use a generator set on the drive or on the grass with a clear path, which means fuel storage and exhaust need a place too. The crew may plug into an exterior outlet on the house, which means the outlet's circuit has to carry the tools without tripping and the homeowner should know which breaker it is. Or the crew may run an extension cord from a garage outlet, which only works if the cord is rated for the length and the tools.
Extension cord length matters more than most people expect. A long, thin cord loses voltage along its length, and a nailer or saw that runs on a weak supply can overheat, stall, or run poorly. A roofer who plans a long run should name the cord gauge and the maximum length on the scope. If the answer is "we will bring what we need," that is not a plan. Keys can write the power source, the cord gauge, and the path on the written scope, so the homeowner can check it against the yard before the crew arrives.
What the water run looks like
Water on a roof job is used for a few things. Crews wet down dusty ground, rinse tools, and sometimes wet a surface to keep grit from blowing. Homeowners often assume the crew will bring its own water. Some do, and some expect the hose bib on the house. If the crew uses your hose, that hose will cross the yard, probably on the same route as the cord, and the hose will carry grit on its way back. Say who owns the hose, who connects it, and who shuts the bib off at the end of the day. A hose left on the grass through a Chesterfield freeze can split at the fitting or the bib, and a cracked bib in February is a plumbing bill the roof job did not set out to create.
Look at the hose bib itself. Some bibs on older Chesterfield homes sit under a soffit or behind a shrub, and the crew will not see them until the drive is under way. Mark the bib on the site sketch, and note whether it has a backflow cover. If the bib is frost-free or freeze-protected, say so. If it is not, plan the water for the day and shut it at the wall in the evening.
Measure the run before the crew books
Walk the path from the street or the drive to the back eave, and count the steps. Measure the distance from the outlet or bib to the nearest roof edge the crew will work from. Note the things on the way: a patio, a fence gate, a planter bed, a set of steps, a dog run, a pool. Write each one down with its distance from the house. A roof crew walking that path with a cord over one shoulder and a bundle of shingles on the other will step where it is easiest to step, and that is often across the bed.
Then decide the route together. The crew may be happy to lay a cord along the house wall and up a side yard instead of across the lawn. You may want the cord kept off the patio. The crew may need a clear lane for a wheelbarrow or a pallet jack. A route agreed on the day of the walk is cheaper than a route argued at eight in the morning with a truck idling.
What a roofer should write down
A written scope for a wide lot should answer a short list of questions. Where does the power come from, and on which circuit? What gauge of cord, and how long is the longest run? Where does the water come from, and who owns the hose? Where are the bibs and outlets on the site sketch? Which path do the cord and the hose take, and what is left unprotected along the way? Who lays the protection boards, and who takes them up?
Ask each roofer the same questions. Two answers can look the same on paper and differ on the lawn. One roofer may say they will run power from the garage and treat the cord as an afterthought, while another may name the cord gauge and the route and mark the bib on a sketch. The second answer is the one you can check.
What it costs
A long run is usually not a separate line on a roof bid, but it can carry a cost. A generator rental, a heavier cord, a second hose, or a crew member who spends extra time moving the cord each morning all show up in the labor and equipment. Ask whether the price assumes an outlet on the house, a generator on site, or a cord from the garage. If the answer changes the number, ask for the difference in writing. Ask what happens if the outlet you were told about turns out to be on a dead circuit or has no cover.
What to ask
- Which outlet or generator will power the tools, and on which circuit?
- What cord gauge and maximum length are planned for the longest run?
- Where does the water come from, and who owns and connects the hose?
- Which path do the cord and hose take across the lot, and which beds, patios or gates do they cross?
- Who shuts the bib off each evening, and who checks it before a freeze?
- Are the power and water route on the written scope and the site sketch?
Keys Roofing can walk the back of your Chesterfield lot with you before the crew is scheduled, and the office number is (314) 220-2333. Bring the sketch you already have, and mark the outlets, bibs and gates before the call.