Chesterfield's Rolling Lots Send Roof Water Downhill Before the Gutters Can Catch It
On a sloped Chesterfield lot, roof water can reach a neighbor's grass before your gutters help, so settle the runoff route before the job starts.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
Many Chesterfield lots are not flat. Subdivisions on the rolling ground that makes up much of the city often have a back yard that sits a few feet above or below the front, and a roof plane may face the low side of the lot. When a roof is torn off and the deck is open, rain that falls on that plane has nowhere to go but downhill. Gutters catch some of it once they are up, but during a tear-off they are often down. A sheet of water can then run across the open roof edge, down the fascia, and onto a neighbor's grass or a patio that was never meant to take it. The time to plan for that is before the first nail comes out.
Where roof water goes when the gutters are off
A roof is a set of planes, and each plane sheds water toward its eave. During a re-roof, the old gutters may come down first so the crew can work the edge. Once they are off, water that lands on the open deck or on new underlayment runs straight to the eave and drops. On a level lot, that drop lands at the foundation line, where a splash block or a short run of grade keeps it away from the wall. On a lot that falls away from the house, the drop can run down the slope and find the nearest low corner, which is often the neighbor's side yard or the strip of ground under a side window well.
Ask each roofer to say, in writing, what happens to the water from an open roof on the downhill side. A good answer names the eave, the drop point and whatever catches the flow there. A vague answer such as "we will keep it dry" does not tell you where the water goes when a storm hits on a Tuesday afternoon.
Town roofing: what a Chesterfield lot changes
Chesterfield has older homes on large lots, newer subdivisions with tighter yards, and infill lots where a house sits close to a slope. Each one pushes water in a different direction. On the larger lots, the question is usually the distance from the eave to the property line and whether the crew can reroute water without crossing it. On the tighter lots, the question is whether the downhill neighbor has a retaining wall, a deck, or a basement window at the level where runoff will collect. Those details belong in the scope before the number is final, because they affect how many hours the crew spends on temporary diversion and where the trucks can stand.
St. Louis clay makes the problem worse. Much of the soil under a Chesterfield yard holds water after a heavy rain and stays wet for days. When the ground is already saturated, runoff does not soak in. It moves along the surface and pools at the first low spot. A roof that is open during a wet week is adding water to ground that cannot take it.
Plan the route before the tear-off starts
A few practical choices work on sloped Chesterfield lots, and a roofer should be able to say which ones they will use. Temporary downspout extensions can carry water from the eave to a point below the work area, but only if they are long enough and pitched away from the foundation. Filter socks or straw wattles set at the low end of the flow can slow sediment, which matters when the water carries tear-off grit. Tarps over the lower course of the open deck can limit how much water reaches the eave during a storm, though they add wind load and must be secured. None of these is a cure. Each one changes what the neighbor sees when the rain comes.
The neighbor should know the plan too. A short note on the day the tear-off starts, saying how many days the crew expects to be on the roof and which point water will be routed toward, avoids a late-night call about a flooded patio. Keys Roofing, the contractor behind this site, documents the lot and the route in the written scope, with photos and measurements, so the plan is on paper before anyone climbs a ladder.
What it costs
Runoff control is usually a line item, not an afterthought. Downspout extensions, filter socks, tarps, and the labor to set and remove them each cost something. On a sloped lot, the hours can rise when the crew has to build a route rather than follow a flat one. Ask for these lines to appear separately from the shingle and labor totals, so you can see what the runoff plan costs and whether it is included or carried as an allowance. If a roofer says it is included, ask where it appears in the bid. If it is an allowance, ask what triggers it and who decides when it is spent. A bid that folds the runoff plan into a general site prep line makes two quotes on the same lot hard to compare.
If the plan changes after the tear-off starts, for example because the storm forecast shifts or the deck reveals a low spot, ask how the change is priced and whether the written scope needs a revised page. A change made by text message is not the same as a change in the signed scope.
What to ask
- Which way does water from the open roof run on my lot, and where does it stop?
- What is the drop point at the eave, and what catches the flow there?
- Will the old gutters come down before the tear-off, and when will new gutters or temporary extensions go up?
- What is the plan for a storm during the open-roof days, and who calls the stop?
- Does the neighbor get written notice, and who sends it?
- Where does the runoff plan appear in the bid, and is it priced or an allowance?
Put the answers in writing and compare them line by line. A roofer who has thought through a sloped Chesterfield lot will answer each question without much hedging. If the answers are vague, you have learned what the job will look like on a wet day.
To talk through a Chesterfield lot before you book, call the Keys office at (314) 220-2333. Bring a rough sketch of the house, the slope, the neighbor's property line, and the spot where water usually collects. Ask which parts of the runoff plan the crew will put in writing.