Chesterfield Two-Acre Lots: Who Carries the Shingles to the Back Slope
On a two-acre Chesterfield lot, the trip from the trailer to the back slope is a bid line, so ask who carries the bundles.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
A Chesterfield lot of an acre or two often puts the house well back from the road, with a long drive, a side yard and a back slope that no truck can reach. The shingles still have to get from the trailer to the roof, and the route they take is a line in the bid that many owners never read. Before you compare totals, find out who carries the bundles, how far they travel, and whether that work is inside the price.
Town roofing and the long haul
On a standard Chesterfield lot, the truck can often pull up near the front walk and the crew can stage the pallet close to the eave. On a larger lot, the trailer may have to stop at the street because the drive is narrow, too steep, or simply too far from the back of the house. Bundles then have to be carried through the side yard, around the garage, and up a ladder or lift to the slope that faces away from the road.
Each bundle is heavy enough that a crew counts every trip. A roof of typical size takes many bundles, and each bundle that moves by hand is a separate labor step. The number of trips grows with the distance, the number of stairs or gates on the route, and the number of planes that need shingles. This is why a bid for a two-acre lot can carry a different labor total than a bid for a townhome with the same square count. A crew that has to walk a long stretch of yard before each climb spends more of the day moving material than installing it.
Ground conditions in St. Louis add a second layer. Clay that stays soft after a wet week can sink under a stacked pallet or a loaded hand truck, and a path that crosses a lawn can leave ruts that the crew must repair. In the cold months, a shaded side yard can hold frost well into the morning, so the crew may have to walk a slick route until the sun reaches it. None of this is a reason to refuse the job. It is a reason to name the route in the bid and to agree on who sets the path and what happens to it afterward.
Walk the route with the roofer before the start date is set. Stand at the trailer spot, follow the path to the back eave, and note every gate, step, slope and tree root along the way. A roofer who can describe that walk in a few sentences has seen the lot. A roofer who cannot has priced a house that is not yours.
What it costs
Bid language for carrying material varies. Some quotes fold the haul into labor and never name it. Others list a separate line for material handling, sometimes priced by the bundle, by the square, or by the day. A few add a charge when the trailer cannot park at the curb and the crew needs a second staging point. None of these is wrong by itself. The problem comes when two bids both look complete and one of them has left the haul out, because the total will change the day the trucks arrive.
If a lift or telehandler is needed to reach the back slope, that machine needs its own room on the lot and its own line in the price. Ask whether the lift is in the quote, whether it is rented for the job, and how many days it is counted for. A lift that sits idle while the crew carries bundles by hand is a cost worth questioning, and so is a lift that is brought in for one afternoon but billed for a full week.
Keep the cost question separate from the haul question. A low bid that depends on the homeowner staging the shingles, moving patio furniture, or clearing a path is a bid with unpriced homeowner work in it. Ask each roofer to write that work down, so you can see what you are being asked to do before the crew arrives.
What to ask
Put these questions to every roofer you are comparing, and ask for the answers in writing. Keys Roofing documents its scope with photos and measurements and gives the homeowner a written copy, so the haul route can be recorded in the same way as the rest of the job.
- Where will the trailer park, and is that spot on your lot or in the street?
- How will the bundles get from the trailer to the eave on the back slope, and by what route?
- How many trips does the bid assume for each slope?
- Is carrying included in the labor, or is it a separate line, and how is that line priced?
- Will a lift or telehandler be used, and how many days is it counted for?
- Who sets and clears any boards, mats or stepping plates laid across the lawn?
- Who repairs ruts or lawn damage on the route, and is that in the bid?
- Where do the old shingles leave the lot, and by what route?
If a roofer cannot answer one of these in writing, note the gap next to that bid. A roofer who has walked your lot will usually be able to describe the route in a sentence or two. A roofer who has not walked it is guessing, and the guess belongs on paper before you sign.
Questions about your property can also go to Keys Roofing at (314) 220-2333. Ask for the haul route, the trailer spot and the carrying line to be written into the scope before you choose a start date.