Chesterfield RoofingKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333
Every figure on this sheet is sourced

Clay Under Your Chesterfield House Can Bow the Ridge Before You Order

Chesterfield's shrink-swell clay can move walls and rafters, so measure the ridge and attic before the shingle order is placed.

Sheet
A11
Subject
Storm record and statute
For
A homeowner after a storm
Trade
Roof repair, roof replacement

Chesterfield lots sit on clay that swells when it is wet and pulls back when a dry spell runs through July and August. Over the years that movement can shift a wall a little, and the walls carry the rafter tails and the ridge. A roof that looks square from the street can have a ridge that dips a few inches at mid-span, or an eave that runs out of line with the fascia on one side. Before anyone orders shingles, that difference needs a measurement and a line in writing, because the shingle count, the underlayment layout, and any deck repair all depend on the real shape of the roof rather than the shape on the plans.

Why the clay moves the structure

Shrink-swell clay does not push evenly. The side of the house that sits over wetter soil, especially near a downspout that empties at the foundation or a bed that is kept soaked, can rise while the drier side settles. Basement walls and slab edges usually show it first, as stair-step cracks in brick or a door that has started to stick at the top corner. The roof shows it later. A ridge that is no longer level, rafters that have rotated slightly where they sit on the top plate, or a valley that sags under snow are all signs that the wall beneath has moved. None of this means the house is unsound. It means the old roof has been hiding the shape of the structure, and the crew needs to see that shape before the old shingles come off.

Dry summers add to the problem. When the clay pulls back, it leaves gaps under slabs and along foundation walls, and when the first heavy rains arrive, the soil swells again and pushes. The cycle repeats every year in a way that is slow but steady. Frost adds one more layer. In a St. Louis winter the ground freezes, thaws, and freezes again, and each cycle lifts and drops the soil a little. That movement is the same movement that opens a joint between a porch roof and the house wall, and it is why flashing at a wall that has moved may no longer lie flat against the shingles.

Town roofing

Chesterfield's subdivisions were built over several decades, and the framing in a house from one era is not the same as the framing in a house from another. Older framing often uses rafters that were cut to length on site, with uneven spacing and a few that have been notched for plumbing or ductwork over the years. Newer houses more often use engineered trusses, which are fabricated to a plan and tend to hold their shape, but the walls they bear on still move with the clay under them. Ask which kind of roof structure your house has before the crew arrives. The answer changes what the crew should check and what the bid has to cover.

A practical way to find out is to go into the attic with a flashlight on a dry day. Look at the rafter tails where they meet the top of the wall, the ridge board, and the joints where the rafters meet the ceiling joists. Take photos from the same spot each time, so that a later visit can be compared with the first. Note any rafter that bends visibly, any gap at the top plate, and any dark stain on the decking that looks old. Those notes are not a repair order. They are a record of the structure as it stood before anyone touched it, and they give you something specific to check against the next bid.

What a measured roof looks like on paper

A roof bid should show how the roof was measured. If the roof was sized from a satellite image or a drone flight alone, the planes may be estimated as flat or regular when they are not. A crew that walks the roof, measures each plane with a tape or a laser, and checks the ridge height at mid-span against the eave height gives you numbers that match the house. Ask whether the ridge was checked for level, and whether the eave-to-ridge rise was recorded for each slope. A bid that lists only a total square count does not answer either question, and it leaves the crew to discover the difference on the roof.

Keys writes the measurements, the photos, and the ridge and eave readings into a written scope that you keep. That document is what you compare against the next bid. If two bids list different rises for the same slope, the difference is a question to settle in writing before a shingle is ordered, not a surprise to find on the ladder. The same is true of any structural note. If the crew writes that a rafter tail is cracked or that a ridge needs attention, that note should appear in the scope with a photo, and it should say what the crew proposes to do about it.

What it costs

A structure problem caused by clay movement usually does not appear as a line on the quote until the crew finds it. That is the point where the cost gets set, so the bid should explain how it will be set. Sistering a rafter, which means fastening a new board alongside a damaged one, is often priced per piece or per foot. Resetting a rafter tail or replacing a sagging ridge board is usually priced by the labor hours plus the lumber. Neither number belongs in a general allowance with no explanation behind it. If your bid has an allowance line for structural repair, ask what the allowance covers, what the unit price is, and who must approve the work before it starts.

The decking rate is worth fixing in writing too. If a soft deck is found under the old shingles at a settled corner, the cost depends on how many sheets need to come out and what the replacement board is. Many bids name a rate for each sheet and leave the count open, which is reasonable only if the count is reported back to you with photos before the new deck is covered. Ask for both the rate and the reporting step, and ask to see each soft area before it is hidden under underlayment.

Ordering shingles is a separate step that depends on the measurements. If a ridge runs low in the middle, the change in plane area may be small, but the cut lines at hips and valleys can shift enough to change the waste. Ask the crew to confirm the shingle count after the structure has been checked, and to say whether any shingle order will be placed before the deck has been inspected. Shingles can be reordered, but a plane cut to a plan that was never measured costs more than the difference in a single bundle, and it is harder to correct once the nails are in.

What to ask

Before you sign, ask these questions and write the answers down on the bid itself.

  • Who went into the attic, and were the rafter tails and the ridge photographed?
  • Does the bid list the measured eave-to-ridge rise for each slope, or only a total square count?
  • Is any structural repair priced as a unit, and what is the unit?
  • Who approves a sistered rafter or a reset ridge before the work starts?
  • If the deck is soft under a settled corner, what is the rate per sheet, and will you see each soft spot before it is covered?
  • Will the shingle order wait until the deck and structure have been checked?

If your lot slopes toward the foundation, or a downspout discharges near a wall, mention it at the walk-through. Those details shape the structure question as much as the clay does. A roof measured on a dry day, with the attic open and the old roof still on, gives you a picture of the house before tear-off that you can compare against later photos. Keys Roofing can be reached at (314) 220-2333 to set up that walk and to go through the questions on this list.

Chesterfield, Missouri

Have the roof documented properly

Photographs, measurements and a written scope, produced by somebody who has been on the roof. What you do with the document is entirely your business.

(314) 220-2333

Roofing, gutters and downspouts only. Licensed and insured.

No obligation. A person calls you back.