Cut-Through Traffic Can Set Your Chesterfield Roof Hours
A cut-through street can carry commute and school traffic past your roof trailer, so ask each roofer to write down the hours the crew will work.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
A cut-through street is one that drivers use to skip a signal or a busy arterial. In Chesterfield, a house on one of those streets can see a steady stream of cars at the morning commute, the school run, and the early evening trip home. A roof crew parked on that street for a full day is in the path of all of it. The trailer, the dumpster and the shingle truck take up lane space, and a narrow street has less room to spare than a cul-de-sac does.
This page is for the homeowner who has already decided to replace the roof and is now comparing when the work can start. The question here is simple: when does the street have room for the crew, and who sets the hours? Ask that before you pick a date, because the answer changes how many days the job takes and whether the crew can leave the trailer parked overnight.
Find out which streets carry through traffic
Start with your own street. Stand at the curb at 7:30 in the morning and again at 4:30 in the afternoon for two weekdays, and count the cars that do not stop at your house. Note whether they slow down, whether they use the wrong side of the road to pass, and whether the same cars come back in the evening. If a stream of cars passes your house every few minutes during those windows, your street is carrying through traffic, even if the posted speed is low.
Next look at the streets that connect to yours. Many Chesterfield neighborhoods have one or two entrances that feed a larger road. Drivers who miss the light at that road often cut through the subdivision. If the cut-through route runs past the spot where the roof trailer would normally sit, the crew needs a different parking plan.
Write down the times when the traffic is heaviest. These are the windows the crew should avoid for truck and trailer moves, and the windows when a homeowner most needs the driveway clear for the shingle delivery.
What the crew needs from the street
A roof crew uses the street in three ways. The shingle truck needs room to stop and unload, usually with a boom or a pallet lift that reaches the driveway or the curb. The dumpster or haul trailer needs a place to sit for the length of the job, and the crew needs a route to walk between the house and the truck. On a cut-through street, each of these can block a lane that drivers expect to be open.
The truck is the largest item. A delivery at the start of the job usually means the truck stops for a short time, but the stop has to be safe. If the truck has to stop in a lane that cars use to pass, drivers may swerve around it, or they may stop behind it and wait. Either outcome is a risk for the crew and for the drivers.
The trailer is the second item. It sits for days, not minutes. If it sits on the curb at a bend or near a driveway with poor sight lines, cars coming around the bend may not see it until late. Ask the roofer where the trailer will sit, how far it stands from the curb, and whether it will be moved each evening.
Ask for the hours in writing
Ask each roofer what hours the crew will work and what hours the crew will avoid. A good written answer names a start time, a stop time, and the times when the trucks will not move. It also says what happens if the crew runs late and has to stay past the normal end of the day. Ask whether the crew will move the trailer off the street at night, and whether anyone will be on site to watch it.
Ask how the crew will handle delivery. The shingle delivery is a set time, so ask for a window rather than a single hour. Ask whether the driver will call before arriving and whether the crew will stage the bundles in the driveway rather than on the street. If the bundles have to sit on the street, ask how long they will wait and who keeps them out of the path of cars.
Ask whether the crew will use cones, signs or a flagger on the street. A cone line is a simple way to mark a work zone, but it only helps if someone sets it out and picks it up each day. Ask who is responsible for that job and how the cones are placed.
Check the street with the city before the crew arrives
In Chesterfield, a work zone or a parked trailer on a public street can fall under city rules. Ask your roofer whether a permit or notice is needed for the trailer or for any lane closure. Ask the city's public works office or the police non-emergency line whether a lane closure has to be reported before the work starts. Keep the answers in writing and send a copy to the roofer.
Tell your neighbors before the first truck arrives. Give them the dates, the expected hours and the number to call if the crew is blocking a driveway. A neighbor who knows the plan is less likely to call the police when a trailer sits on the curb for a week.
Plan the tear-off day around the traffic
The tear-off day is the busiest day on the street. Old shingles come down into a dumpster or trailer, and the crew makes more trips to the truck and the curb than on any other day. If the street has heavy commute traffic, ask the roofer to plan the tear-off for a window that avoids the commute. Some crews start early and finish before the morning rush. Others work through the middle of the day and leave the street clear by mid-afternoon. Ask which pattern the crew uses and whether it can change if the street is busier than expected.
If the job runs longer than planned, ask how the roofer will keep the street clear during the extra days. A roof that is open overnight also needs a plan for weather, which is a separate question covered elsewhere on this site.
What Keys documents and what it leaves to you
Keys Roofing documents the job in writing. The written scope includes the measurements, the shingle product, which is Atlas or Malarkey, and photos of the roof before and after the work. Keys puts that scope in the homeowner's hands so the traffic plan, the hours and the delivery window are on paper. Keys attends the job as the contractor and can answer questions about the crew's schedule. If you need to change the hours or the trailer spot, call the Keys office at (314) 220-2333.
Missouri law under RSMo 407.725 bars a roofing contractor from representing or negotiating a homeowner's insurance claim, and it also bars a roofer from saying anything about paying, waiving or covering a deductible. The traffic plan is a separate matter from any insurance claim, so the homeowner can ask the roofer for the street plan without involving the insurer at all.
Questions to take to each roofer
- Which hours will the crew work, and which hours will the trucks avoid?
- Where will the trailer sit, and will it move off the street each night?
- What delivery window will the shingle truck use, and will the bundles stay in the driveway?
- Who sets and removes cones or signs, and who checks them each morning?
- Does the city require a permit or notice for the trailer or a lane closure?
- Who speaks to neighbors and the driver if the street gets blocked?
Write the answers down next to the scope. If one roofer answers each question in writing and another answers only by phone, the difference tells you something about how the job will run once the trucks are on the street.