Chesterfield RoofingKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333
Every figure on this sheet is sourced

Limestone Under Your Chesterfield Lot Is a Roof Day Question

Parts of west St. Louis County sit on limestone that can dissolve into voids, so check the ground record before you set a roof date.

Sheet
A11
Subject
Storm record and statute
For
A homeowner after a storm
Trade
Roof repair, roof replacement

Most Chesterfield homeowners think about the ground under a roof job only when the trucks arrive. The ladder goes against the wall, the trailer sits on the drive, and the shingle pallets wait on the lawn. Parts of west St. Louis County sit over limestone bedrock, and limestone can dissolve over a long time into pockets and voids. When the soil above a void thins out, it can settle or open with little warning. A roof date is the wrong time to learn what kind of ground you have.

Town roofing: why the bedrock matters on your lot

You do not need to be a geologist to ask the question. What matters is whether the ground under the staging area, the ladder feet, and the trailer path has a history of settling. Most lots are fine, and a normal lot needs only normal care. A lot that has shown a sag, a cracked slab that keeps cracking, a round patch of lawn that never fills in, or a sunken spot near a downspout deserves one more look before a pallet of shingles goes down on it.

The weight is the reason. A loaded shingle pallet can weigh well over a ton, and a roof trailer adds its own load on top of that. A ladder foot that sinks two inches is a fall waiting to happen, and a pallet skid that punches into soft ground can tip a bundle stack. Ground that is solid enough for a patio can still fail under a point load concentrated on one small spot.

Start with what is already on record. Look for any published karst or sinkhole mapping that covers your area, the USDA soil survey for your parcel (it shows the soil type and whether the soil sits shallow over rock), and any geotechnical report that was done when your house or a nearby addition was built. Those sources do not map every void, and they do not replace someone walking the lot. They do tell you whether to ask harder questions before the crew arrives.

Walk the lot yourself with a phone. Look for a depression in the lawn that has no obvious cause, a circle of ground that is slightly lower than the grass around it, a driveway crack that runs in a line instead of a web, water that drains into one spot and never runs off, and any place where the mulch or soil seems to pull into a hole. Photograph each one with a date. If you find something, do not guess what it means. Mark it, tell the roofer in writing, and let the roofer say how the crew will stage around it.

Older Chesterfield subdivisions often have lots where the grading was done decades ago, and the fill around the house may have settled unevenly. That is a separate question from bedrock, but it looks similar from the surface. Both call for the same habit: know where the heavy things will sit before the first one arrives.

What it costs

A ground check for a reroof is usually a walk, a records search, and a few photos. It costs little and it often answers the question. A geotechnical boring is a different job. It means a drilling crew, lab work, and a written report, and it is generally not something a homeowner orders for a shingle replacement unless the lot already shows trouble. Do not assume a roof bid includes any ground survey. Read the bid for the words ground survey, boring, or engineer, and if they are missing, ask whether they are excluded.

The more likely costs come from the staging plan. Ground mats or plywood under the trailer and the pallet spots spread the load, and a bid should say whether they are included. If the crew finds a soft spot on the day, the work can stop while someone decides what to do. A stop like that costs time, and time can change the schedule. The written bid should name who pays for standby hours if the crew has to pause for a ground question, and who pays for any engineer's letter that the city or the permit desk asks for.

Ask whether the roofer has seen a staging problem like this before on a Chesterfield lot. A roofer who has worked the area can often name the spots that need mats without a long discussion. A roofer who says the ground will be fine without looking at it has not answered the question.

What to ask

Put these questions to each roofer in writing before you pick a start date:

  • Where will the trailer, the pallets, and each ladder foot sit, and is that spot on the photos you sent me?
  • What ground protection is in the bid, including mats or plywood under the trailer and each pallet spot?
  • If the crew finds a soft or hollow spot on the day, who stops work, who decides the next step, and who calls me before the crew moves on?
  • Who decides whether an engineer's letter is needed, who orders it, and who pays for it?
  • Who pays for standby hours if the ground question holds up the crew?
  • Can you walk the staging area with me before the trucks come, and will you put what you find in a dated note?
  • Who keeps the photos of the ground before and after the job, and when do I get a copy?

Keys Roofing can be reached at (314) 220-2333 to set up a walk of the staging area before the crew is booked. The walk costs you an hour of your time and gives you a dated record of the ground before anything heavy touches it.

Chesterfield, Missouri

Have the roof documented properly

Photographs, measurements and a written scope, produced by somebody who has been on the roof. What you do with the document is entirely your business.

(314) 220-2333

Roofing, gutters and downspouts only. Licensed and insured.

No obligation. A person calls you back.