Railroad Ties on a Chesterfield Slope Can Decide Where the Roof Ladder Stands
Old railroad-tie walls on a Chesterfield slope can shift or rot, so check them before the ladder and staging go on the lot.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
A railroad-tie wall on a sloped Chesterfield lot looks sturdy from the driveway. Dark timbers stacked in a terrace behind the house have held back the hill for years, and most owners never think about them until a roof crew needs to stand below the eave with a ladder. That is when the wall starts to matter. The ladder feet, the staging pile and the tear-off debris all want the same flat strip of ground, and the wall decides how much of that strip is actually level and actually solid.
Why ties ended up on Chesterfield slopes
Many older lots that were graded for houses have cut and fill slopes. Builders and owners used stacked timber because it was inexpensive, easy to set by hand, and did not need a formed concrete footing. The ties were usually set on a compacted gravel base, and the top course often sits a foot or two below the grass line. Some were set directly on native clay, which moves with the seasons. Others sit on fill that has settled unevenly since the day the lot was graded. A homeowner rarely knows which of these they have without digging.
The practical point for a roof job is simple. A tie wall that holds the hill is also carrying the load of the soil behind it. When a crew stacks shingle pallets, a dumpster or a roof trailer on the flat ground at the top or bottom of the wall, they add weight the wall was never designed to carry. You do not need to be an engineer to see the risk. You only need to look at whether the ties lean, whether the top course has shifted outward, and whether there are gaps where soil has washed through.
What the wood does after twenty years
Treated timber lasts a long time, but it does not last forever in wet clay. Freeze and thaw cycles push water into every joint. In a St. Louis winter the ground can freeze and thaw several times in a month, and each cycle loosens the bed under the lowest course. Spikes or rebar pins that once held the ties in line can rust, and the ties can rotate or slide. Look for ties that feel soft when you press a screwdriver into them, for bulging in the middle of a run, and for a gap opening between the wall and the house.
In practice, a wall that has gone a decade with no upkeep is often sound at its center and weak at its ends, where the grade changes and water pools. The corners and the last tie before a downspout outlet deserve a closer look than the long straight run.
Water is the other half of the problem. Downspouts that discharge at the foot of a tie wall can wash soil out from behind it. A roof replacement often means the downspouts come down, the gutters come off and the water path changes for several days. If an outlet sits near the wall, ask the roofer where water will run during tear-off and whether the outlets will be reset before the crew leaves.
Where the ladder lands
A roofer's ladder is usually set at the eave, and on a sloped lot the feet may sit on the uphill side, the downhill side, or on a small bench the wall creates. Each position carries a different risk. A foot set on a tie that is not fully bedded can slip, and a foot set on loose soil behind a wall can sink into the void. Some crews use ladder stabilizers or a wide base to spread the load, and those stabilizers need flat, solid ground to work.
A ladder can also look plumb while its feet are not level. On a wall that bows, the rails may appear straight from the eave while the feet sit at different heights on the slope. Ask which spot the foreman plans to use, whether the feet will be set at matching heights, and whether the crew will walk that spot before the ladder goes up.
On a steep lot the crew may use a roof jack system or a fall protection anchor secured through the roof deck. Those anchors do not touch the wall. The ladder does. If the wall is leaning, the crew may decide the eave cannot be reached safely from that side, and that can change the start day or the method. That decision belongs to the crew on site, and the crew should explain it to you in writing the same day.
What the crew needs written down
Before the first pallet arrives, the wall should appear on the site plan. The plan should show where the ties are, which section looks compromised, where the ladder will stand and where materials will wait. A written note such as "keep pallets off the tie wall, stage on the driveway apron" is more useful than a verbal promise. If the crew plans to set a dumpster near the wall, the note should say so and name the spot where the bin will rest.
Take photographs of the wall before the job starts. Shoot the full run from the street, then shoot close-ups of any bowed or leaning sections, the top course, and the joints where ties meet. Date the photos. If the wall shows damage after the job, the dated set is the record of what it looked like when the crew arrived. Keys Roofing puts a written scope with photos and measurements in the homeowner's hands, and the same habit applies to the yard. Ask every roofer to document the wall the same way.
The cheapest check is one you can do on a dry afternoon. Walk the wall, lay a straight board along the top course and note any gap wider than a finger. Write the date and the measurement on paper and give it to the roofer. That note helps the crew plan the staging, and it gives you something to compare against after the job is finished.
Questions to ask before you book
- Which spot on the lot will the foreman use for the ladder, and will the crew walk that spot before setting it?
- Will any pallet, dumpster or trailer be set on or against the tie wall?
- If the wall is damaged during the job, who reports it, who photographs it, and what happens next?
- Where will the downspouts discharge during tear-off, and will they be reset before the crew leaves?
- Is the wall named in the written scope, or is it treated as outside the roof work?
If you want an answer on the wall before you sign, call Keys Roofing at (314) 220-2333 and ask for a site walk. A short walk of the slope with the foreman will settle more than a phone call, and the answers should appear in the written scope before any material is ordered.