Chesterfield RoofingKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333
Every figure on this sheet is sourced

Shallow Rock Under a Chesterfield Lot Can Stop a Ground Anchor

Ask whether the crew will set ground anchors on your Chesterfield lot, and what happens if the stake hits rock before the plan works.

Sheet
A11
Subject
Storm record and statute
For
A homeowner after a storm
Trade
Roof repair, roof replacement

Most roof bids talk about the roof and say nothing about the ground around it. On a Chesterfield lot, the ground decides several things the bid does not mention: where a material hoist can stand, where a tarp tie-down can be set, and whether a stake or auger goes in at all. Parts of the county have limestone or other hard material close to the surface, and a crew that plans its ground work as if the soil were uniform can lose a day when a bar stops at rock. This page covers the question to put to each roofer before the crew arrives: what goes into your ground, and where.

Why ground work shows up on a roof job

A roof crew does not work only from the ladder and the roof deck. Depending on the job, the company may set a stake to tie off a tarp along a wall, a base for a material hoist, or a footing under a temporary scaffold leg. Each of these needs a spot in the ground that will hold. The roof itself is not the issue here. The issue is what the bid assumes about the soil under the work zone, and whether anyone has checked it.

What shallow rock looks like before the crew finds it

You will not usually see bedrock from the driveway. Signs worth checking include a yard that drains slowly and has bare ledges where the grass thins, a patio or retaining wall that needed a long bar or a jackhammer when it was built, and garden beds where the shovel stops after a few inches. A recent foundation or grading survey, if you have one, may list the depth to rock or refusal. If you do not have one, ask the roofer whether a bar or a probe will be used at each anchor point before the first hole is made.

What the lot plan should show

A useful lot plan is a dimensioned sketch, not a sales map. It should show the house footprint, the eave lines, the drive, the front walk, the side gate, any patio or retaining wall, and each point where the crew expects to set something. Measure each point from a fixed object such as the corner of the garage or the edge of the walk, so the spot can be found again on the day the crew arrives. A plan that says near the back corner will be argued about on roof day.

What to ask each roofer

  • Where each anchor, post or base will go, marked on your lot plan before the crew arrives.
  • Whether they will probe the ground with a bar before drilling or driving anything.
  • What they do if rock stops a hole: move the anchor, switch to a surface base, or stop and call you.
  • Who pays for an extra trip if the first plan fails, and whether that cost is written in the bid.
  • Whether any hole will be dug inside a utility line or easement, and who confirmed the line locations.

Surface bases are often the better answer

Where the ground will not take an anchor, a surface base or a weighted fixture can do the same job without a hole. A flat plate with no penetration can hold a tie-off line on a paved drive or a patio, and a bolted base can sit on a footing that already exists. Neither needs to be dug. The trade-off is that a weighted base sits on your surface, so the bid should name that surface and say whether the base will mark the pavers, the concrete or the stone edging. Ask for the choice in the written scope, not as a remark made at the door.

Chesterfield ground is not one kind of ground

Chesterfield covers more than one soil and rock condition. Parts of the Chesterfield Valley sit lower and drain slowly, and other pages on this site cover the water side of that problem. Higher ground in the county can have rock closer to the surface. Treat that as a pattern, not a map. The lot next door can differ from yours, and a neighbor's trench or a neighbor's stone wall tells you about their soil, not yours. The only reliable answer is the lot itself, which is why the anchor plan should be tied to your yard and not copied from a standard template.

Permits, utilities and the municipal side

Setting a post or drilling into a public strip, such as a curb strip or a right-of-way, can need its own permission from the city or county. Inside your private lot, the permission question is usually simpler, but the work still has to stay off buried lines. Before any probe goes in, ask whether the work touches a utility, and confirm that the locate has been called in through the 811 system. Permit desks in St. Louis County differ from one jurisdiction to the next, so the answer for your address is the one that counts. The desk that serves your address can say whether a ground fixture needs its own permit.

What to do if the anchor hits rock

Stop the hole, mark the spot, and ask the crew to stop digging there. A rock stop does not mean the roof plan has failed. It means the plan needs a second version at that point. The crew should write the new location on your lot plan, photograph the partial hole, and tell you what changed. If the new anchor needs a different base, the price and the scope should change in writing before the work goes on. Keep the photo and the note with the rest of your project file.

Calling Keys

If you want the ground questions answered before you choose a roofer, call the Keys office at (314) 220-2333 and ask for the anchor and staging plan for your address. The office can explain where the crew expects to set anything and what the written scope will say about it. Ask for that plan in writing before you sign.

Chesterfield, Missouri

Have the roof documented properly

Photographs, measurements and a written scope, produced by somebody who has been on the roof. What you do with the document is entirely your business.

(314) 220-2333

Roofing, gutters and downspouts only. Licensed and insured.

No obligation. A person calls you back.