Chesterfield RoofingKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333
Every figure on this sheet is sourced

The Clock Change Shortens Your Chesterfield Roof Day

Daylight saving ends November 1, so a Chesterfield roof day loses light at both ends. Here is what to check in the bid before you set the date.

Sheet
A11
Subject
Storm record and statute
For
A homeowner after a storm
Trade
Roof repair, roof replacement

On Sunday, November 1, 2026, clocks in Chesterfield go back an hour at 2 a.m. On paper the change is small. A roof crew works by daylight, though, and an hour taken from the evening can move a whole schedule. If your roof is set for late October or the first weeks of November, the bid you signed was probably written with the old clock in mind, and it is worth checking now.

Town roofing

Chesterfield lots do not share one exposure. A house on a wide open lot in a newer subdivision gets sun on every side for most of the day. A house tucked under mature oaks off a cul-de-sac may have a north slope that stays shaded and damp until the sun clears the tree line, while the south slope is dry and warm by midmorning. After the clock change, the crew's first hour falls at a different point in the day, so the shaded side can still be cold and dark when the crew expects to begin. The sunny slope is in the sun, but the shaded one is not ready yet.

Frost is the practical problem. Chesterfield mornings in November often bring a light frost on the north and east sides of a house, and frost on shingles makes them slick. A roofer who will not walk a frosted slope is making a safety decision, and that decision costs time. Ask what the crew does when the first slope is still frosted at the scheduled start. Some crews start on the sunny side and come back to the shaded slope after lunch. Others wait. Either answer can be fine, but the bid should say which one the crew will use, because it changes what the first day produces.

Cold also changes the shingle itself. Asphalt shingles seal with the strip on the back of each tab, and that seal works best in warm weather. A cold November slope may need tabs hand sealed, which takes more time per square than a warm day. Keys Roofing installs Atlas and Malarkey shingles, and the cold-weather sealing method for each product is something to confirm with the crew before the date is set. Ask whether the crew plans hand sealing into the schedule, and whether that work is in the bid or billed as extra.

The afternoon has its own problem. Late in the day the sun sits low, and on a west slope it can throw glare into a crew member's eyes while they lay courses near the ridge. Light also leaves the lot earlier. In the weeks after the change, the shade under the tree line can cover the back of the house by late afternoon, and the crew may need to stop before the work is done. An open section has to be tarped before dark, so the last hour of light is not a free hour. Ask who checks that tarp before the crew leaves the roof for the day.

Drive access is the same as always, but the window is shorter. The roof truck and the trailer need to arrive, unload, and clear the street before school traffic and evening commuters fill it. If the truck has to wait on a turn in the dark, the day starts late and ends in the dark. Settle the arrival window and the departure window together, and write both into the schedule the crew signs.

What it costs

A clock change does not raise a roof price by itself. What it changes is how many working hours a crew can fit into a day that has daylight in it. Bids differ in how they count the work. Some price the job in crew days, others in labor hours, and a few state a number of working days without saying how long each one is. If your bid says the tear-off and the install take two days, ask how many hours each day counts, and whether that count assumes the long light of summer. A shorter daylight window can turn a planned day into a day and a half. That extra half day can show up as a schedule change, as a second mobilization charge, or as nothing at all, depending on how the bid was written.

Ask the roofer to put the answer in writing. A bid that says the job will finish in a given number of days should also say what happens if the crew loses light to frost, wind, or a late truck. Some bids price that as a change order. Others carry it inside the labor line. Neither is wrong by default, but a homeowner comparing two bids should know which approach each roofer has chosen. A quote that says it adds nothing for the clock change should still explain what hours it assumes.

Equipment runs on a different clock than the crew. Compressors and generators are often billed or budgeted by the day, so a late finish can add fuel and rental time the bid did not show. Ask each roofer whether the price includes equipment run time through the last sunlit hour, or only the standard working day.

What to ask

Put these questions to each roofer before you sign, and ask for the answers in writing:

  • What time does the crew start on the first day after November 1, and what time does it stop when the light is gone?
  • Does the schedule count daylight hours or clock hours, and how many hours does each day assume?
  • If a slope is frosted at the start time, which slope does the crew open first?
  • Who decides to stop for the day when the wind rises or the light fails, and how is that call passed to you?
  • Which shingle does the crew install, and how does the crew seal it in cold weather?
  • If the job runs into a second day because of short light, what does the bid say about cost and the completion date?

Keys Roofing can walk the north and south slopes with you before a date is set. The walk covers the frost-prone side, the shade line under the trees, and the spot where the truck can stand when the light is low. Keys documents the roof, puts the written scope in your hands with photos and measurements, and lists the hours each day is expected to take on the same sheet as the start time. Call the office at (314) 220-2333 to set the walk before the calendar gets tight.

Chesterfield, Missouri

Have the roof documented properly

Photographs, measurements and a written scope, produced by somebody who has been on the roof. What you do with the document is entirely your business.

(314) 220-2333

Roofing, gutters and downspouts only. Licensed and insured.

No obligation. A person calls you back.