The Trail Behind Your Chesterfield Lot Is Not Yard for the Crew
Before the crew stages ladders and bundles, check whether a shared trail or easement runs behind your Chesterfield lot and who controls that strip.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
Many Chesterfield lots back onto something that is not the homeowner's yard: a walking trail, a greenway, a shared common area, or a utility easement along the rear property line. When a roof job starts, the crew needs room for ladders, a dumpster or trailer, and a stack of shingle bundles. That room is often sitting on the far side of a fence, in land that belongs to someone else or to a subdivision association. Before the first bundle is staged, the question is who controls that strip and whether the crew is allowed to use it.
Find the line before you find the trail
Start with your plat or the survey you received at closing. It shows the lot line, any recorded easements, and sometimes a note about a trail or open space parcel. If you cannot find it, the county recorder's office keeps plats for recorded subdivisions, and your subdivision's trustees or management company can usually send a copy. The aim is to know exactly where your lot ends. A rear fence is often set inside the true line, and a gate can open onto a path you do not own. Walk the rear boundary with the plat in hand before you assume the fence marks the edge.
Many Chesterfield subdivisions have common areas governed by a homeowners association. Some associations own open space outright. Others hold only an easement for a path, a drainage swale, or a pedestrian route. The difference matters. An owner of a common area may allow access for a project with notice, and an easement holder may have rules about what can be placed inside the strip. Neither is settled by the roofer's good intentions, and neither is settled by a verbal okay from a neighbor who happens to be on the board.
What a trail user will see on roof day
Walkers, runners and cyclists keep using a trail while a roof is being replaced. A crew that stacks bundles on a path, runs a cord across it, or leaves a dumpster half in the walkway creates a hazard for people who have no connection to the job. Ladders are the usual problem. A ladder set at the rear eave that leans across a path is a trip risk, and it is also a question someone will ask the association later.
Debris is the second issue. When tear-off material falls, nails and granules fall with it. On a public or shared path, that material is hard to sweep up completely, and a magnet run along the edge of a trail is not the same as a magnet run over a lawn you own. Ask each roofer how they plan to sweep the strip, not only the yard, and ask whether the sweep happens at the end of each day or only at the end of the job.
Questions to put to the roofer
- Which part of the rear side will the crew use for ladders, and does that spot sit on your lot?
- Where will the dumpster or trailer stand, and is that space inside your property line?
- Will any material, cord or ladder cross a shared path or common area at any time?
- Who will sweep the rear strip at the end of each day, and how is that written into the schedule?
- Does the crew need the association's permission before they use the strip, and who asks for it?
Get the answers in writing as part of the proposal. A roofer who says the crew will just "figure it out" on the day has not decided where the ladder goes, and the decision will end up being made by whoever is standing on the path.
Check the association before the order goes in
If your lot touches a common area, call the association's management contact before you schedule the tear-off. Ask whether there is an architectural or work-notice rule for projects that touch shared land, whether they need advance notice of a crew, and whether there are days or hours when the trail is busy. Some associations ask for a short written notice with the dates and the company name. Others have no rule at all. Either answer is useful, because it tells you what to say to the crew and what to put on the schedule.
Also check who maintains the trail. Some paths are owned by the association, some by a city or county parks department, and some are shared between the two. A public trail may fall under a parks schedule for closures or repairs. In that case, a crew working near it should keep the path clear without needing special permission, but you still want the roofer to name who they will call if a cone, a closure, or a temporary barrier is needed, and how long that will take.
Keep the strip clear and the neighbors informed
Mark the rear edge of your lot before the crew arrives. A few stakes or flags along the fence line help the crew see where your property ends and where the shared land begins. Tell the people who use the path, through a neighborhood message board if your association runs one, that work is starting and when it will finish. A short note that gives the dates and the company name heads off most questions before they reach you.
Keep the rear gate latched and the fence closed during the job, unless the crew has a plan for going through it. A gate left open lets a dog, a child, or a walker reach a work area with loose material on the ground. If the crew needs to pass through the gate each morning, agree on the time and the route before the first day, and make sure the gate is closed again each evening.
What to do if a roofer wants the trail
Sometimes a roofer will say the rear strip is the easiest place to stage. It may be easiest for the crew and the worst choice for everyone else. If the answer is that the trail is the only option, do not agree on the call. Ask for a written plan that names the strip, the dates, the cones or barriers, and the sweeping schedule, and check it against your plat before you sign. If the plan needs the association or the parks department, the approval should be in hand before the start date is set, not after the trucks arrive.
Ask the roofer to walk the rear of the lot with you before the job is scheduled, and keep the staging plan with the rest of your proposal so the crew, the association and you are all working from the same map. If a question comes up that the plat does not answer, the Chesterfield office can be reached at (314) 220-2333 to talk through the rear-side plan before any materials are ordered.