The Utility Easement Behind Your Chesterfield Lot Needs an Owner's Yes

The strip behind many Chesterfield lots may belong to a utility or the city, so find out who holds it before the roof crew stages there.

Sheet
A11
Subject
Storm record and statute
For
A homeowner after a storm
Trade
Roof repair, roof replacement

Many Chesterfield lots have a strip of ground behind the fence that looks like yard but may not be yours to use. It can hold a buried gas line, an electric pedestal with a gray lid, a storm pipe under a grass swale, or a sewer line running toward a main. When a roof crew walks a back yard, it sees flat ground and a short walk from the house, and that is where bundles, a ladder or a dumpster line can end up if nobody has asked. Before you agree to a staging spot, find out who holds that strip and what they allow on it.

Town roofing: what the easement is

An easement is a right to use part of someone's land for a stated purpose. The owner keeps the title. The holder, which is often an electric or gas company, a water provider, the city or a subdivision association, keeps the right to reach its pipe, line or box. The easement is usually shown on the recorded subdivision plat or written into the deed for the lot. Plats and deeds are filed with the St. Louis County Recorder of Deeds, and a closing packet from a recent purchase usually includes a copy. If you have owned the house for years, the packet may be in a file box, and the recorder's office can pull the plat by subdivision name.

Two kinds turn up often behind Chesterfield homes. A utility easement lets a provider run lines and reach them for repair. A drainage easement keeps a swale or pipe open so storm water keeps moving toward its outlet. The utility owns the first. The second may belong to the city or to the subdivision, and the subdivision may have its own rules about what can be placed in it. Both can cover the same strip, and a plat can show more than one line along the rear of a lot.

Why the holder cares about a roof crew

A roof job puts weight and traffic where a yard usually sees neither. A full pallet of shingle bundles is heavy, and stacking it on soft ground can leave ruts that stay until spring. On a shallow line, a loaded pallet or a dumpster set on top can crush a conduit or a pipe. A ladder pushed into the soil can strike a line that was never marked. The easement holder has no reason to care about your roof, but it has every reason to keep its line safe, which is why a note from the holder counts for more than a neighbor saying it is always fine.

Timing matters too. A utility may need notice before it sends a crew to look at a line, and a locate request filed through 811 has to be marked within a set number of working days. If the roof date is set before those answers arrive, the crew may be asked to clear the strip at the worst moment. Ask about the holder's answer before the date is set, not after the first pallet arrives.

How to find out before the crew arrives

  1. Pull the recorded plat for your lot, or the closing packet, and look for labeled or shaded strips along the rear and side lines.
  2. Walk the strip with your phone. Photograph every lid, pedestal, meter, marker post and painted flag, with the fence or the house in the frame so the spot is easy to place.
  3. Call 811 before anyone sets a stake, digs a post or drives a pallet jack across soft ground. Missouri One Call relays the request to the owners of buried lines, and their marks are what protect the crew.
  4. Ask the utility's right-of-way or locating desk whether it allows bundles, a dumpster or a ladder on its strip. Ask for the reply in writing, with the date and the name of the person who gave it.
  5. If the strip is a drainage easement, ask the city's engineering or permit desk, or your subdivision association, what may be placed in it, and whether a temporary dumpster counts.

Keep the photos and the holder's reply in the same folder as the signed scope. If a utility later marks a line near the staging spot, you will have the walk, the date and the answer in one place, and the crew will be working from the same record you hold.

Where the crew can stage instead

Many staging problems have a plain fix. Bundles can wait on the driveway or on a tarp at the side of the house, away from the strip, as long as the driveway can carry the weight and the path from the truck to the ladder is clear. A dumpster may fit on the driveway, though a placement in the street or on a public right-of-way needs the city's permit desk. Ask the roofer to name the spot it has picked and the reason, then ask that the spot appear on the plan you sign. A spot that is only spoken is the one that gets forgotten on the day.

What it costs

An easement by itself does not change what a roof costs. What changes the price is handling. If the crew cannot stage on the strip and has to carry bundles from the driveway around the house, that is extra labor on the ground, and the bid should say whether hand carry is included or listed as its own line. If the holder asks the crew off the strip during a locate or a repair, the schedule may move. Ask what happens to the date, and whether a day lost to a holder's request is priced into the bid or handled as a change order. Get those terms in writing before you sign. Ask Keys Roofing to place the staging spot and any hand-carry labor on the written scope, so the spot and the number appear together. The office is (314) 220-2333.

What to ask

Bring these to the walk-through and note the answers on the scope.

  • Which strips on my lot are recorded as easements, and who holds each one?
  • Will any bundles, pallets, dumpster or ladder touch the easement strip? If yes, has the holder said so in writing?
  • Where exactly will the bundles wait, and is that spot on the plan I sign?
  • Has a locate request been filed through 811 before any stake or pallet goes in?
  • If the crew must carry materials from the driveway, is that labor in the price or a separate line?
  • If a utility asks the crew off the strip mid-job, what happens to the schedule and the bid?
Chesterfield, Missouri

Have the roof documented properly

Photographs, measurements and a written scope, produced by somebody who has been on the roof. What you do with the document is entirely your business.