Utility Tree Crews on a Chesterfield Street Can Take Your Roof Day
A bucket truck on your block can take the curb your roof trailer needs, so put the tree work and roof work in one written order.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
A tree crew on a Chesterfield street is a different problem from a tree on your own lot. Utility crews trim branches away from overhead lines on their own schedule, and when they work a block they bring a bucket truck, a chipper, a chip truck, and often a cone line that takes up the curb in front of two or three houses. None of that checks whether your roofer has already booked the trailer for the same week. If the trimming and the tear-off land together, the two crews end up competing for the same pavement, and the party with the least control over the schedule is usually the homeowner.
This page is about how to find out whether a tree crew is coming, what to write into the roof plan, and what to ask your roofer before the start date is final. It is written for a Chesterfield homeowner who has a bid in hand and is trying to set a day that will hold.
Town roofing
Most Chesterfield streets are wide enough for one roof trailer and a delivery truck when the parked cars stay on one side. The trouble starts when a bucket truck sets its outriggers on the same stretch. A bucket truck needs a level, firm spot about the size of a parking space, and it needs the line of its lift clear of the wires. The roof trailer needs room to turn, and the shingle truck needs a clear run to the drop point at the drive or the curb. If the trimming crew is working the same block, three large vehicles can end up needing the same few feet of asphalt, and nobody on the roof crew will have a say in which one moves.
Check three things before you set the roof date. First, look at the overhead lines on your block and at the trees under them. Trimming crews usually work where branches are close to conductors, so a line of freshly cut limbs on the next street may mean the crew is working toward you. Second, ask the city's public works office and your utility whether trimming is scheduled on your block and for how many days. Third, ask your roofer whether a bucket truck or chip truck on the street changes the delivery window, and whether they would rather move the shingle drop to a different day.
If a notice has been posted on a pole, a sign, or your door, photograph it with the date visible. A notice is the only written record of when a utility crew said it would work, and a roofer can use that record to plan around it. Without the notice, the start date rests on someone's memory of a phone call.
Do not assume the crew will keep to the sidewalk. Chipper discharge can throw wood chips and small limbs over a wide area, and a roof tear-off already puts grit, nails and shingle scraps on the ground. If the crew is working near your roof edge, ask both crews who sweeps what, and whether the chip pile will sit on your lawn or on the street. A chip pile left in the grass beside the drive is not a neutral thing. It sits on the path your roofer will use to carry bundles and tear-off debris to the trailer, and a wet pile in April can turn that path into mud before the first bundle lands.
Look up, too. A limb cut over your house can fall onto the roof during the trimming, and the roofer may need to stop work until the limb is cleared and the deck is checked. If a limb already hangs over the roof, ask who cuts it and when, before the roofer starts. That is a dated task with a named owner, not a favor between neighbors. A tree crew working for a utility is not the same as a tree company your roofer will hire, and the bid should not blur the two.
Street timing matters as much as the curb. Deliveries are easiest in the early part of the day, before the morning commute fills the arterials and before school drop-off puts cars at the curb. A trimming crew often works during the daytime, so the two crews may overlap on the same morning. Ask the roofer which hour the shingle truck plans to arrive, and ask the trimming crew, through the utility, which hour it expects to start on your block. If those two hours overlap, one of them should move, and the move should be written down before anyone is on the roof.
What it costs
A tree crew does not change the price of the shingles, but it can change what the roofer bills for time. If the roof crew waits on a trimming crew to clear a line or to finish a limb over the work area, a standby day or part of a day may show up on the invoice. If the delivery truck has to be rerouted or turned away, a second drop fee may follow. Ask the roofer to write down what happens to the price if the start slips a day or two because of trimming on the street, and whether that cost is already in the bid or will be added later.
Ask too how many standby hours the bid assumes and what the standby rate is after that. A bid that says standby is billed at cost, with no rate given, leaves the number open. The same is true of a bid that promises to rebook a lost day at no charge but gives no date for the rebook. Get both answers in writing before the crew is booked, and compare them across bids the same way you would compare the shingle line or the flashing line.
When you compare two bids, check whether either one names the trimming work at all. A bid that says nothing about the street is not a bid that expects no trimming. It is a bid that did not ask. If one roofer asks about the block and the other does not, the first one is giving you a better chance of a start that holds, even if the first bid is a little higher on the page.
The homeowner can also lower the chance of a costly delay. Moving the car out of the drive on delivery day, putting the trash carts where the trailer can pass, and leaving a clear path to the side yard all keep a day from being lost. None of that is expensive. A standby hour is not expensive either, but several of them in a row add up on a bill that was supposed to be fixed.
What to ask
Ask each roofer these questions before you accept a start date on a street where tree crews are working:
- Has your crew worked a Chesterfield street where a utility trimming crew was working at the same time, and how did you handle the curb?
- Where does the bucket truck or chip truck need to stand, and does that spot overlap the trailer, the dumpster or the shingle drop?
- If a trimming crew blocks the street on delivery day, who reschedules the shingle truck, and does the new date come with a time in writing?
- Who sweeps chips and small limbs off the drive, the walk and the roof edge, and at what point in the day?
- If a limb falls on the roof during the trimming, who stops the work, who clears the limb, and what does the bid say about that?
- What is the standby rate, and how many standby hours are already in the bid?
- Which hour does the shingle truck plan to arrive, and which hour does the roof crew expect to start on the roof?
Write each answer beside the question it answers, and keep the page in the same folder as the bid. A roofer who answers the first question with a specific street, a day, and the way the curb was split is giving you something you can check later. A roofer who says it has never been a problem, with no detail behind that, has not answered. Ask the same questions of every roofer on your list, and in the same order, so that the answers can be compared line by line.
Walk the block with the roofer before the start date, and ask them to point to the spot where the trailer will sit, the spot where the bundles will wait, and the path the crew will use from the street to the eave. Ask them to mark it on a sketch or a photo and to send that sketch to you. If a utility crew is scheduled, ask them to mark where the chip pile and the bucket truck will go as well. If the trimming crew's plan changes, the sketch is the thing you can point to when the two crews disagree.
If you want to talk through a Chesterfield block with Keys Roofing before you choose a start date, the office number is (314) 220-2333.