Where a Mobile Blood Drive Bus Parks, the Roof Truck Waits

A mobile blood drive bus on a Chesterfield street or church lot takes the curb space your roof crew may need, so settle the dates first.

Sheet
A11
Subject
Storm record and statute
For
A homeowner after a storm
Trade
Roof repair, roof replacement

A mobile blood drive bus is a converted vehicle with a generator, a few folding tables and a sign that goes up on a church lot, a school parking area, a shopping center or a curb in front of an office park. It stays for a few hours, sometimes most of a day, and donors come and go on foot and by car while it runs. For a Chesterfield homeowner planning a roof, the bus matters because it can sit on the exact curb, drive aisle or lot edge that a roof truck, trailer or pallet drop would otherwise use. If your house sits near one of these stops, the roof plan should say so before the crew picks a date.

Town roofing

A roof job in Chesterfield needs three kinds of space. The first is a place for the crew to park the truck and a dump trailer, close enough to the house that the hauling lines stay short. The second is a turn that a long box truck can make without backing into a driveway or a neighbor's yard. The third is a spot for the shingle pallet, which needs firm, level ground and enough room for a forklift or flatbed to set it down. A blood drive bus can take one or more of these spaces for a whole afternoon, and the volunteer who parks it is usually not thinking about roofers.

The place where this shows up most often is a church or school lot close to a residential street. Those lots have wide aisles and open pavement, which makes them look like a good staging area. On a drive day, though, the pavement near the entrance is taken by cones, a canopy, a generator on a trailer and a line of cars waiting to park. A crew that tries to use that space will find its trailer boxed in, and it will spend the first hour of the day moving equipment instead of nailing shingles.

Street parking is the other problem. A bus parked on the public street in front of your home sits in the right-of-way, and so does a roof trailer. Chesterfield's rules for temporary parking, cones and lane closures depend on the kind of street, whether it is a collector road, a cul-de-sac or a private drive inside a subdivision. The homeowner does not need to know every rule, but the roof plan should name who asks the city for any street use, and whether that request is filed before the crew arrives or on the morning of the job.

Timing is the third part of the picture. Blood drives run through the year, including the cold months, and that is when many roofers are working on repairs or late-season replacements. A bus with its generator running can be loud, and a crew nailing shingles near it works under that noise. A bus can also hold the lot into the afternoon, just when the crew is trying to get the roof closed before the evening cold sets in. In November and December the day is shorter and the sun sits low, so a start that slips by two hours can eat into the last usable window before dark.

Chesterfield's freeze and thaw cycle adds one more reason to plan the lot early. A paved lot that held a bus in the morning may have ice patches or wet spots in the shade by the time the trailer arrives. Ask the roofer whether the crew will walk the staging spot before unloading, and whether it will move the trailer to firmer ground if the first spot is soft.

What it costs

A blood drive bus does not cost a homeowner anything directly, and a roof bid does not add a line for it. The cost shows up when a roof day stops. If the crew cannot stage materials or move the trailer, the day gets shorter, and the job may need a second day, which means a second round of mobilization, a second set of drive time and a second look at the weather. A written bid should say who pays for a return trip and how the crew counts hours lost to a blocked lot. A roofer prices the labor for the day it expects to have, so the question to ask is what happens when that day is cut in half.

The cost that matters most to a homeowner is time with the roof open. An open roof has more exposure to rain, and in St. Louis an afternoon storm can build quickly while the deck is still bare. Ask the roofer how long the tear-off stays open once it starts, and what the crew does with an open section if the day ends early. The answer belongs on paper. A roofer who says the crew will "figure it out" has not answered the question.

There is also a cost that is easy to miss, which is your own time. If the start moves twice because a lot is full, you may need to rearrange work, pets, deliveries or a guest room more than once. A roofer who gives you a firm arrival window and a named person to call when the window moves is saving you hours, even if the price stays the same.

What to ask

Before you pick a start date, put these questions to each roofer and keep the answers in one place.

  1. Does the roofer know of a blood drive, church event, school event or other lot use on your block, and who told them?
  2. Where will the truck, trailer and shingle pallet sit on each day of the job, and is that spot inside your property line or on the street?
  3. If a bus or event blocks the planned spot, what is the second spot, and who decides it on the morning of the start?
  4. Who asks the city for any street use, and when is that request filed?
  5. What time does the crew arrive, and what time does it expect to leave the lot clear?
  6. If the start slips because the lot is full, who calls you, and how much notice is promised?
  7. How long will the roof stay open, and what does the crew do with an open section if the day ends early?
  8. Is the noise plan written, including generator and nail gun hours?

Write each answer beside its question, and ask the same questions of every roofer you compare. A roofer who answers in writing gives you something to hold. A roofer who answers only on the phone leaves the question open. If you want to hear how Keys Roofing answers these, call the office at (314) 220-2333 and ask for the answers in writing before you book a start date.

Chesterfield, Missouri

Have the roof documented properly

Photographs, measurements and a written scope, produced by somebody who has been on the roof. What you do with the document is entirely your business.