Your Chesterfield Privacy Fence Is the Roof Truck's Side Wall
A rear privacy fence can narrow the lane the roof trailer needs, so settle the gate, the panels and the drop path in writing before tear-off.
- Sheet
- A11
- Subject
- Storm record and statute
- For
- A homeowner after a storm
- Trade
- Roof repair, roof replacement
Many Chesterfield lots run a privacy fence along the back and down one side, and that fence often sits closer to the house than the yard suggests. When a roofer brings a trailer, a dumpster and a stack of shingle bundles onto a lot like that, the fence becomes part of the work route. A panel that gets knocked loose, a gate that will not open wide enough for a material cart, or a post set in soft ground can stall the whole day. Settle the fence question before the first truck arrives, not while the crew is standing at the gate.
Town roofing
Chesterfield lots vary a great deal. Some are wide, with a rear yard that runs out to open ground, and others are tight, with the fence set a few feet from the eave on one side. Freeze and thaw cycles push fence posts out of plumb over a St. Louis winter, so a fence that looked square in October may lean by spring. On roof day the practical question is simple: can the crew move material from the street to the back of the house, and can it carry the debris out again without climbing over or through the fence?
Start with a tape measure and a walk along the fence line. Measure the clear width at the gate and again at the narrowest point between the fence and the house or a wall, then write both numbers down. Many gates are only about three feet wide, which is fine for a person but tight for a loaded bundle cart or a sheet of plywood. A wide enough opening is a question for the bid and the site walk, not something to discover on the morning of the job.
Look closely at the fence material as well. Wood panels on cedar or pressure-treated posts take a ladder rail and a foot on the top rail better than most other types, though they pick up tar and nail heads. Vinyl gets brittle in a hard cold snap, and a panel that is levered out of its rails can crack at the lock. Chain link bends at the top rail when a ladder leans against it. Shingle granules and nails fall into the gaps on any type of fence, and a flat wood cap holds that debris while a rounded vinyl cap lets much of it slide off. Ask the roofer how the fence top will be swept at the end of each day, because a fence that holds nails will also cut a dog's paws and a child's hands.
Ground conditions matter too. In a wet spring, a trailer wheel can sink into soft soil along a fence line, and a crew that tries to pull the trailer around a tight corner may scrape the bottom rail or drag a post. If the drive is paved and the trailer can stay on it, the fence line is safe. If the trailer must run on grass beside the fence, the bid should say so, and you should decide whether you want that route at all.
What it costs
A fence repair is not a roofing line, and a roof bid should not quietly absorb one. If a panel breaks because a crew member pushed a pallet through a gate, the written scope should say who replaces the panel and at what price. Some bids state that the contractor will repair damage its own crew causes. Others leave the sentence out entirely. The missing sentence is the one that costs money later, because a single broken panel in a Chesterfield backyard can mean a new panel, a new post in some cases, and the time and cost of matching the stain or the vinyl color on the old run.
Ask for a unit price for each fence panel and for each post that may need to be reset. A price per panel is far easier to check than a lump sum that says fence repair as needed. Ask whether the bid includes a temporary barrier at the gate, and whether that barrier is part of the labor or a separate charge. If you already have a fence contractor, ask the roofer whether that contractor can take the fence down and reset it, and what the roofer will charge to work around the fence while it is down.
Protection costs little next to a replacement panel. A plywood or fabric guard at the gate, a cone or rope line along the fence, and a dated set of photos taken before the crew arrives all fall in the small-money range. The photos matter most. A fence that was already leaning, cracked or stained will look different once a loaded trailer has been wheeled past it, and a photo taken on the day before the job is the only record that shows the starting condition. Take the photos yourself, with the date showing, and keep the originals.
A pet changes the price of protection, because a gate left open for a few minutes can become a loose dog. If the bid does not mention a pet or a child in the yard, add a line asking how the gate will be latched each time the crew passes through it. That line is part of the fence plan, not an extra.
What to ask
Before you pick a roofer, ask these questions and get the answers in writing:
- Which gate will the crew use, and what is its clear width in inches?
- Will the trailer and the material pallets pass through the fence, or will they stay on the street or the paved drive?
- Where will the ladder rest, and will any part of it touch a fence rail or panel?
- Who replaces a fence panel or post that the crew damages, and what is the unit price for each?
- Will a temporary barrier be set at the gate if a panel must come down during the work?
- Who takes photos of the fence before the crew starts, and who takes them again when the work is done?
- Who latches the gate at the end of each day, and who holds the key or the code?
The answers should match the site walk. If a roofer says the crew will use the back gate but cannot say how wide that gate is, ask for the measurement before the start date is set. If the roofer says the fence will not be touched but the drop path runs straight through a panel, the two statements do not agree, and the bid needs one correction before you sign. A written fence plan is one of the simplest ways to show that a roofer has walked the lot rather than priced it from a map.
Keys Roofing can walk the lot with you and write the fence notes into the scope if you ask for them. The office number is (314) 220-2333. Measure the gate and the fence line before you call, so the conversation starts with real numbers.